Spalding M867SF12 manual After pole has been secured to plate 2 loosen nut

Page 15

15.

After pole has been secured to plate (2) loosen nut (18),

 

remove cotter pin (8), and pull out pin (13). This will allow the

removal of the assembly bolt (14) which is no longer necessary for the remainder of the assembly and installation of system.

WARNING!

WARNING: ONLY AFTER

NUTS (25) HAVE BEEN

FULLY TIGHTENED:

Remove cotter pin (8) and pin (13) to remove assembly bolt (14) from bottom plate (2).

18

24

9

14

8

25

13

25

24

15

08/06

ID# M867SF12

Image 15
Contents In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Mounting plate 2 and secure as shown Install threaded ends of J-bolts 19 through holesBuild drainage hill Side ViewAreas shown Insert bushings 26 and 27 intoMounting plate 2 as shown Playing SurfaceCompleted Assembly Yoke Placement First attach board 11 to upper yoke Using TWO people to hold the boardAttach backboard 11 to upper and lower YokesRim Assembly Apply name plate stickers 15 to lower yoke as shown Install net 4 to rim as shownPlayingsurface Remove cotter pin 8, and pull out pin 13. This will allow After pole has been secured to plate 2 loosen nutFeet 05 m Limited Lifetime Warranty