Spalding M867SF12 manual Yoke Placement

Page 10

9.

While still in forward position, attach both yokes (17) to pole as shown.

WARNING!

THREE PEOPLE

REQUIRED FOR THIS

PROCEDURE. FAILURE

TO FOLLOW THIS

WARNING COULD RESULT

IN SERIOUS INJURY

AND/OR PROPERTY

DAMAGE.

21

12

20 21

22

17

17

FIGURE

B.

3.2"

18"

12

IMPORTANT!

YOKE PLACEMENT

From the top of the pole to the top of the upper yoke’s bracket should be approximately 3.2”.

From the bottom of the upper yoke’s bracket to the top of the lower yoke’s bracket should be approximately 18”.

SEE FIGURE B

ID# M867SF12

08/06

10

Image 10
Contents In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Install threaded ends of J-bolts 19 through holes Mounting plate 2 and secure as shownSide View Build drainage hillInsert bushings 26 and 27 into Areas shownPlaying Surface Mounting plate 2 as shownCompleted Assembly Yoke Placement Yokes Using TWO people to hold the boardAttach backboard 11 to upper and lower First attach board 11 to upper yokeRim Assembly Install net 4 to rim as shown Apply name plate stickers 15 to lower yoke as shownPlayingsurface After pole has been secured to plate 2 loosen nut Remove cotter pin 8, and pull out pin 13. This will allowFeet 05 m Limited Lifetime Warranty