Spalding M867SF12 manual Install threaded ends of J-bolts 19 through holes

Page 5

1.

Ensure ground is level with playing surface, then dig pole hole.

24" (61 cm)

WARNING!

GROUND SURFACE

24" (61 cm)

48" (121.9 cm)

PLAYING SURFACE

CONTACT UTILITIES BEFORE DIGGING.

48" (121.9 cm)

2.

Install nut (25) to J-bolt (19) as shown. Repeat procedure for remaining three J-bolts (19).

IMPORTANT!

Make sure nuts (25) are 2.75” (7 cm) from top of J-bolts

25

2.75”

(7 cm)

19

25

2

25

3.

Install threaded ends of J-bolts (19) through holes

in mounting plate (2) and secure as shown.

 

 

 

NOTE:

Make sure J-bolts (19) are in the illustrated position.

Nuts on the top of plate are used for leveling the pole after system is fully assembled.

19

5

08/06

ID# M867SF12

Image 5
Contents In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Mounting plate 2 and secure as shown Install threaded ends of J-bolts 19 through holesBuild drainage hill Side ViewAreas shown Insert bushings 26 and 27 intoMounting plate 2 as shown Playing SurfaceCompleted Assembly Yoke Placement Attach backboard 11 to upper and lower Using TWO people to hold the boardYokes First attach board 11 to upper yokeRim Assembly Apply name plate stickers 15 to lower yoke as shown Install net 4 to rim as shownPlayingsurface Remove cotter pin 8, and pull out pin 13. This will allow After pole has been secured to plate 2 loosen nutFeet 05 m Limited Lifetime Warranty