1. | Ensure ground is level with playing surface, then dig pole hole. |
24" (61 cm)
WARNING!
GROUND SURFACE
24" (61 cm)
48" (121.9 cm)
PLAYING SURFACE
CONTACT UTILITIES BEFORE DIGGING.
48" (121.9 cm)
2.
Install nut (25) to
IMPORTANT!
Make sure nuts (25) are 2.75” (7 cm) from top of J-bolts
25
2.75”
(7 cm)
19
25
2
25
3. | Install threaded ends of | |
in mounting plate (2) and secure as shown. | ||
| ||
|
|
NOTE:
Make sure
Nuts on the top of plate are used for leveling the pole after system is fully assembled.
19
5 | 08/06 | ID# M867SF12 |