Spalding M867SF12 manual Playingsurface

Page 14

14.

WARNING!

THREE PEOPLE REQUIRED FOR THIS

PROCEDURE.: TWO PEOPLE ARE REQUIRED TO

GUIDE AND SUPPORT THE SYSTEM WHILE THE

THIRD PERSON IS TIGHTENING NUT (25) TO

RAISE THE SYSTEM UPRIGHT.

FAILURE TO FOLLOW THIS WARNING COULD

RESULT IN SERIOUS INJURY AND/OR

PROPERTY DAMAGE.

Upright pole (1) by tightening nut (18).

Using 15/16” wrench, turn nut (18) clockwise to begin standing pole upright. Continue to turn nut (18) until pole has come to rest against washers (24) and pole is vertical.

Once pole is in its final position, install washers (24) and nuts (25) onto J-bolts (19) and fully tighten to secure pole to base plate

1

1

18

25

24

24

7

PLAYINGSURFACE

ID# M867SF12

08/06

14

Image 14
Contents In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Install threaded ends of J-bolts 19 through holes Mounting plate 2 and secure as shownSide View Build drainage hillInsert bushings 26 and 27 into Areas shownPlaying Surface Mounting plate 2 as shownCompleted Assembly Yoke Placement Yokes Using TWO people to hold the boardAttach backboard 11 to upper and lower First attach board 11 to upper yokeRim Assembly Install net 4 to rim as shown Apply name plate stickers 15 to lower yoke as shownPlayingsurface After pole has been secured to plate 2 loosen nut Remove cotter pin 8, and pull out pin 13. This will allowFeet 05 m Limited Lifetime Warranty