Spalding M867SF12 manual Playing Surface, Mounting plate 2 as shown

Page 8

7A.

Rest top of pole (1) on a piece of scrap wood (not included) and line up holes in pole to holes in

 

mounting plate (2) as shown.

WARNING!

THREE PEOPLE REQUIRED FOR THIS PROCEDURE. FAILURE TO FOLLOW THIS WARNING COULD RESULT IN SERIOUS INJURY AND/OR PROPERTY DAMAGE.

2

1

PLAYING SURFACE

SCRAP WOOD

(NOT INCLUDED)

1

PLAYING SURFACE

7B.

Insert bolt (23) through holes in plate and pole and secure with nut (22).

1

23

22

ID# M867SF12

08/06

8

Image 8
Contents In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Install threaded ends of J-bolts 19 through holes Mounting plate 2 and secure as shownSide View Build drainage hillInsert bushings 26 and 27 into Areas shownPlaying Surface Mounting plate 2 as shownCompleted Assembly Yoke Placement Using TWO people to hold the board Attach backboard 11 to upper and lowerYokes First attach board 11 to upper yokeRim Assembly Install net 4 to rim as shown Apply name plate stickers 15 to lower yoke as shownPlayingsurface After pole has been secured to plate 2 loosen nut Remove cotter pin 8, and pull out pin 13. This will allowFeet 05 m Limited Lifetime Warranty