Spalding M867SF12 manual Side View, Build drainage hill

Page 6

4.

 

Fill hole with concrete. Tamp down concrete to release air pockets

 

and build drainage hill.

DRAINAGE HILL

1" (2.54 cm)

PLAYING SURFACE

 

SIDE VIEW

5.

Insert J-bolts (19) from mounting plate (2) into cement as shown. Move assembly around to release

 

any air pockets in cement, then rest mounting plate on cement drainage hill. Apply some pressure to

level mounting plate on top of drainage hill. Level mounting plate and square with playing surface. Clean off any excess cement on mounting plate at this time and place washers (24) onto J-bolts.

IMPORTANT!

Check leveling of mounting plate several times with carpenter’s level while concrete is curing.

IMPORTANT!

 

Front of mounting plate

 

(2) must be parallel with

PLAYING SURFACE

playing surface.

 

24

24 24

2

24

IMPORTANT!: WAIT A MINIMUM OF 72 HOURS BEFORE GOING ON

TO NEXT STEP. CONCRETE MUST CURE. ALLOW ADDITIONAL TIME

FOR COLD, WET OR HUMID WEATHER.

ID# M867SF12

08/06

6

Image 6
Contents In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Install threaded ends of J-bolts 19 through holes Mounting plate 2 and secure as shownSide View Build drainage hillInsert bushings 26 and 27 into Areas shownPlaying Surface Mounting plate 2 as shownCompleted Assembly Yoke Placement Yokes Using TWO people to hold the boardAttach backboard 11 to upper and lower First attach board 11 to upper yokeRim Assembly Install net 4 to rim as shown Apply name plate stickers 15 to lower yoke as shownPlayingsurface After pole has been secured to plate 2 loosen nut Remove cotter pin 8, and pull out pin 13. This will allowFeet 05 m Limited Lifetime Warranty