Spalding M867SF12 manual Completed Assembly

Page 9

8.

TWO people are required to lift pole into position so that the threaded assembly rod

(14)can be installed and secured by the THIRD person.

While pole is being supported by TWO capable adults, position rod (14) and lock into place with hitch pin (13) and cotter pin (8).

Slide barrel washer (9) onto other end of rod (14) and secure with washer (24) and nut (18). Tighten nut (18) until it is positioned 3-3/4” from the end of the rod (14) as shown (Figure A).

18

24

1

9

WARNING!

THREE PEOPLE

REQUIRED FOR THIS

PROCEDURE. FAILURE

TO FOLLOW THIS

WARNING COULD RESULT

IN SERIOUS INJURY

AND/OR PROPERTY

DAMAGE.

Completed Assembly

14 8

13

Fig. A

9

08/06

ID# M867SF12

Image 9
Contents In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Mounting plate 2 and secure as shown Install threaded ends of J-bolts 19 through holesBuild drainage hill Side ViewAreas shown Insert bushings 26 and 27 intoMounting plate 2 as shown Playing SurfaceCompleted Assembly Yoke Placement Attach backboard 11 to upper and lower Using TWO people to hold the boardYokes First attach board 11 to upper yokeRim Assembly Apply name plate stickers 15 to lower yoke as shown Install net 4 to rim as shownPlayingsurface Remove cotter pin 8, and pull out pin 13. This will allow After pole has been secured to plate 2 loosen nutFeet 05 m Limited Lifetime Warranty