Spalding 21196804 manual Side View

Page 10

6. Fill hole completely with concrete.

3

5

4

1" (2.54 cm)

IMPORTANT!: CONTINUE ON TO NEXT STEP.

DO NOT WAIT FOR CONCRETE TO CURE.

Tamp down concrete to release air pockets and build drainage hill. Level pole section in all directions several times while concrete is curing.

7.

1" (2.54 cm)

NOTE A:

Make a reference mark here for anti-skid tape.

NOTE B:

Keep flange pushed down to concrete and leveled.

1" (2.54 cm)

DRAINAGE HILL

PLAYINGSURFACE

SIDEVIEW

IMPORTANT!: WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO NEXT STEP.

CONCRETE MUST CURE.

P/N 21196804 10/04

10

Image 10
Contents Inground System Before YOU Start Parts List See Hardware Identifier Safety Instructions Hardware Identifier Bolts & Screws #22 Section a Assemble the Pole TOP Middle FIG. a Side View Keep Ground Sleeve CAP on Bottom Pole Label should be Front Side Tighten just until washers 10 stop moving Side Section B Assemble the Elevator Tubes to Backboard 10/04 As shown Container to Mix Phillips-Head Screwdriver 4 Wrenches 21196804 10/04 Install Slam Jam Rim to Backboard USE EYE Protection Reinforcement Bar 21196804 10/04 Install clips NET Installation None Playing Surface 10 ft 05 m