Spalding manual 21196804 10/04

Page 24

8.

Fill pole with concrete to approximately 1” (2.54 cm) below bottom elevator hole as shown.

IMPORTANT!:

FAILURE TO FILL YOUR

POLE COMPLETELY WITH

CONCRETE AS

DESCRIBED IN THESE

INSTRUCTIONS WILL

VOID ALL WARRANTIES

WRITTEN AND IMPLIED.

1

IMPORTANT!:

Make sure that concrete does not bulge

from the end of pole assembly. Allow concrete to completely cure.

IMPORTANT!:

WAIT A MINIMUM OF 24 HOURS BEFORE GOING ON TO NEXT STEP.

CONCRETE MUST CURE.

P/N 21196804 10/04

24

Image 24
Contents Inground System Before YOU Start Parts List See Hardware Identifier Safety Instructions Hardware Identifier Bolts & Screws #22 Section a Assemble the Pole TOP Middle FIG. a Side View Keep Ground Sleeve CAP on Bottom Pole Label should be Front Side Tighten just until washers 10 stop moving Side Section B Assemble the Elevator Tubes to Backboard 10/04 As shown Container to Mix Phillips-Head Screwdriver 4 Wrenches 21196804 10/04 Install Slam Jam Rim to Backboard USE EYE Protection Reinforcement Bar 21196804 10/04 Install clips NET Installation None Playing Surface 10 ft 05 m