Spalding 21196804 manual Section B Assemble the Elevator Tubes to Backboard

Page 16

SECTION B: ASSEMBLE THE ELEVATOR TUBES TO BACKBOARD

This is what your system will look like when you’ve finished this section:

TOOLS REQUIRED FOR THIS SECTION

(2) Wrenches 1/2", (2), 9/16"" and (2) 3/4"

AND/OR

(2) Socket Wrenches and Sockets

1/2” 9/16” 3/4”

HARDWARE USED IN THIS SECTION (not actual size)

#9

#47

#24

#27

 

 

 

 

#11

#42

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

#31

#22

 

 

 

#41 (1)

#8

 

 

 

 

 

 

 

 

 

 

Identify elevator tubes (28 & 30).

Toward

Board

Upper Elevator tube

Toward

Board

Lower Elevator tube

Toward

Pole

30

Toward

Pole

28

P/N 21196804 10/04

16

Image 16
Contents Inground System Before YOU Start Parts List See Hardware Identifier Safety Instructions Hardware Identifier Bolts & Screws #22 Section a Assemble the Pole TOP Middle FIG. a Side View Keep Ground Sleeve CAP on Bottom Pole Label should be Front Side Tighten just until washers 10 stop moving Side Section B Assemble the Elevator Tubes to Backboard 10/04 As shown Container to Mix Phillips-Head Screwdriver 4 Wrenches 21196804 10/04 Install Slam Jam Rim to Backboard USE EYE Protection Reinforcement Bar 21196804 10/04 Install clips NET Installation None Playing Surface 10 ft 05 m