Spalding 21196804 manual FIG. a

Page 9

3.

Snap two halves of ground sleeve (4) together.

Insert and secure bottom pole section

(3)into ground sleeve

(4)by tightening ground sleeve cap (5).

4. Fill hole approximately 1/3 full with mixed concrete.

NOTE: Flared end goes inside ground sleeve.

4

3

5.

FIG. A

 

FLANGE

Insert ground sleeve assembly and center in hole (FIG. A).

Note: Leave 1" below flange exposed for drainage hill.

SIDE VIEW

PLAYING SURFACE

1" (2.54 cm)

5

4

IMPORTANT!:

NOTE POSITION OF

FLANGE

IMPORTANT!: CONTINUE ON TO NEXT STEP. DO NOT WAIT FOR CONCRETE TO CURE.

9

10/04

P/N 21196804

Image 9
Contents Inground System Before YOU Start Parts List See Hardware Identifier Safety Instructions Hardware Identifier Bolts & Screws #22 Section a Assemble the Pole TOP Middle FIG. a Side View Keep Ground Sleeve CAP on Bottom Pole Label should be Front Side Tighten just until washers 10 stop moving Side Section B Assemble the Elevator Tubes to Backboard 10/04 As shown Container to Mix Phillips-Head Screwdriver 4 Wrenches 21196804 10/04 Install Slam Jam Rim to Backboard USE EYE Protection Reinforcement Bar 21196804 10/04 Install clips NET Installation None Playing Surface 10 ft 05 m