Spalding 21196804 manual TOP Middle

Page 8

1.

Mark pole sections with tape (not supplied) at indicated distances from ends as shown.

1

TOP

2

MIDDLE

Tape (Not Supplied)

BOTTOM

3

2. Ensure ground is level with playing surface, then dig pole hole.

WARNING!

 

GROUND SURFACE

18" (42.7 cm)

CONTACT UTILITIES

 

BEFORE DIGGING.

 

24" (61 cm)

IMPORTANT!:

Maximum distance from edge of hole to edge of playing surface 6” (15.2 cm).

6" (15.2 cm)

PLAYING SURFACE

P/N 21196804 10/04

8

Image 8
Contents Inground System Before YOU Start Parts List See Hardware Identifier Safety Instructions Hardware Identifier Bolts & Screws #22 Section a Assemble the Pole TOP Middle FIG. a Side View Keep Ground Sleeve CAP on Bottom Pole Label should be Front Side Tighten just until washers 10 stop moving Side Section B Assemble the Elevator Tubes to Backboard 10/04 As shown Container to Mix Phillips-Head Screwdriver 4 Wrenches 21196804 10/04 Install Slam Jam Rim to Backboard USE EYE Protection Reinforcement Bar 21196804 10/04 Install clips NET Installation None Playing Surface 10 ft 05 m