Precor 835 warranty Connecting Cables P30, Location

Page 27

Installing the Console

25

Connecting Cables (P30)

After the console has been seated, separate the individual cables out of the end of the cable assembly and attach them to the appropriate circuit connectors inside the console. Refer to the following diagram and table to identify the cables and connectors.

Figure 13: Cable connections, P30 console

Table 1. P30 internal cable connections

Cable

Connector Type

Circuit Connector

 

 

Location

Safety key

Six-contact strip, keyed

 

(treadmills only)

 

 

Auto Stop sensor

Four-contact strip, keyed

 

(treadmills only)

 

 

Data from base unit

Eight-contact modular,

 

 

on flat gray cable

 

Heart rate sensors

Four-contact strip, keyed

 

Image 27
Contents Assembling and Maintaining the 835 Climber Page Page Edition Information Trademark NoteIntellectual Property Notice Safety Precautions Important Safety InstructionsAssembling and Maintaining the 835 Climber Educating Users Hazardous Materials and Proper Disposal Product Recycling and DisposalRegulatory Notices for the Rfid Module Radio Frequency Interference RFI Federal Communications Commission, PartIndustry Canada Cardiovascular Type Equipment Safety Approvals for Cardiovascular EquipmentRegulatory Notices for Cardiovascular Exercise Equipment European ApplicationsUser’s authority to operate the equipment IEC-320 C13 and C14 plugs Obtaining Service Obtaining Updated DocumentationTable of Contents Commercial Cardiovascular Equipment Limited Warranty Preparing for Installation Assembling the ClimberUnpacking the Equipment Fasteners Hardware Kit not to scaleAssembling the Climber Required ToolsTo assemble the main climber mechanism Important Do not tighten the two hex nuts at this time Slide the plastic top cover onto the upright support Securing the upright support to the climber base Sliding the grommet into place To attach the handrails Attaching the HandrailsAttaching the end caps To level the unit Making Sure the Unit Is StableInstalling the Console Threading the Cable AssemblyTo thread the cable assembly Console positioning on base unit Location Connecting Cables P30To verify that the heart rate display is operational Completing the Console InstallationTo complete the installation Verifying That the Heart Rate Display Is OperationalDaily Cleaning MaintenanceStoring the Chest Strap Daily InspectionMoving the Equipment Long-Term StorageTo move the climber Assembling and Maintaining the 835 Climber Rate of Motion Self-Powered FeaturesInformational Displays Prior to Shutdown Symptoms of a Low BatteryOptional Power Adapter Kit Using the Optional Power AdapterReplacing the Battery Commercial Cardiovascular Equipment Limited Warranty Limited WarrantyWarranty Periods and Coverage Conditions and Restrictions Exclusive Remedies Complete this portion and keep for your records Exclusion of Consequential and Incidental DamagesCommercial Cardiovascular Equipment Limited Warranty Assembling and Maintaining the 835 Climber Page Precor Incorporated