17.
CABLE ASSEMBLY
IMPORTANT: Refer to the CABLE DIAGRAMS and the CABLE ID CHART on pages 24 and 25 for help identifying and routing the cables. While assembling the cables, do not overtighten the locknuts attaching the pulleys; the pulleys must be able to turn freely.
17 |
|
| 38 |
3 | 75 |
| 70 |
34 | 34 |
| |
81 | 75 |
| 45 |
Locate the High Cable (45). | Route the Cable up |
through the Left Top Frame (3) and around a |
|
3 1/2” Pulley (38). Attach the Pulley inside the Top |
Frame with a 3/8” x 2 3/4” Bolt (81), two 3/8” Washers (75), two 1/2” Spacers (34), and a 3/8” Nylon Locknut (70).
18.Route the High Cable (45) around a 3 1/2” Pulley
(38)and down through the Left Top Frame (3). Attach the Pulley and a Cable Trap (91) inside
the Top Frame with a 3/8” x 2 3/4” Bolt (81), two 3/8” Washers (75), two 1/2” Spacers (34), and a 3/8” Nylon Locknut (70). Be sure the Cable Trap
is turned to hold the Cable in the groove of the Pulley.
Note: To complete this step, it may be neces- sary to loosen the four indicated 5/16” Nylon Locknuts (71). Retighten the Locknuts when this step is completed.
19.Remove the preassembled 3 1/2” Pulleys (38) from an Adjustable Double
Wrap the High Cable (45) around a 3 1/2” Pulley (38). Attach the Pulley to the single hole side of the Adjustable Double
3/8” x 2” Bolt (62) and a 3/8” Nylon Locknut (70).
20.Note: The following drawings are shown from the left side of the weight system, with the Left Top Frame (3) removed for clarity.
Wrap the High Cable (45) around a 3 1/2” Pulley (38). Attach the Pulley at the rear hole, inside of the bracket on the Center Top Frame (14) with a
3/8” x 1 3/4” Bolt (66) and a 3/8” Nylon Locknut (70).
11
18 |
|
|
|
|
| 91 | 38 |
|
|
|
|
|
| |
34 |
|
| 70 |
|
75 |
| 75 |
|
|
81 |
|
| 34 | 45 |
|
|
|
| |
|
|
|
| 3 |
|
| 71 |
|
|
19 |
|
|
|
|
|
|
|
| 45 |
|
|
|
| 38 |
|
|
|
| 70 |
|
| 62 |
| 56 |
20 |
|
|
| 70 |
|
|
|
| |
|
|
|
| 14 |
|
|
|
| 38 |
|
|
|
| 45 |
|
|
|
| 66 |