11.Insert the Resistance Bar (9) between the Crossbar Guides (15), and center it on the Crossbar Block (not shown).
Press a Pulley Bracket (10) onto the Resistance Bar (9). Screw a 3/8” x 38mm Tension Screw
(117)into the Pulley Bracket a couple of turns.
Make sure the hexagonal hole in the Screw is on the outside of the Bracket.
Attach a Tether (70) to the Pulley Bracket (10) at the upper hole with an M10 x 64mm Button Bolt (80), an M10 Thick Washer (54), and an M10 Nylon
Locknut (103).
Repeat this step on the other side of the Resistance Bar (9). Then, tighten the lower M10 x 152mm Bolt (86) used in step 10.
12.Hold a Large Pulley (14) inside of the Upper Cable (121). Attach the Pulley to a Pulley Bracket (10) with an M12 x 58mm Button Bolt (87) and an M12 Nylon Locknut (13). Make sure that the cable is routed as shown in the CABLE DIA- GRAM on page 19.
13.Hold a Large Pulley (14) inside the Upper Cable
(121).Attach the Pulley to the other Pulley Bracket (10) with an M12 x 58mm Button Bolt
(87)and an M12 Nylon Locknut (13). Make sure that the cable is routed as shown in the CABLE DIAGRAM on page 19.
Tighten the two 3/8” x 38mm Tension Screws
(117) an equal number of turns.
14.Attach the Leg Lever (56) to the Leg (5) with a Leg Station Pin (60). Slide a Cotter Pin (113) onto the Leg Station Pin.
11 |
|
15 | 70 |
| |
| 103 |
| 54 |
| 9 |
| 10 |
| 80 |
| 117 |
12 |
|
13 |
|
10 |
|
87 |
|
14 |
|
121 |
|
13 |
|
| 13 |
| 117 |
121 | 10 |
| |
87 | 14 |
14 |
|
5 |
|
56 |
|
| 113 |
| 60 |
10