Weider WESY78734 user manual Do not tighten the Locknut yet, Do not tighten the Bolt yet

Page 9

8.

Attach a Large Pulley (14) and the Pulley Plate

8

 

 

 

 

(68) to the Upright (2) with an M12 x 62mm

 

 

 

 

 

 

 

 

 

Button Bolt (81) and an M12 Nylon Locknut (13).

 

 

68

 

 

Do not tighten the Locknut yet.

 

 

13

 

 

 

 

 

 

 

 

14

 

 

 

81

 

2

 

 

 

 

 

 

9.

Pull the Upper Cable (121), which is attached

9

 

 

 

 

inside of the Mech Frame (not shown), up

 

 

 

 

 

 

 

 

 

between the Upright (2) and the Pulley Plate (68).

 

 

 

 

 

 

 

 

 

121

 

Attach another Large Pulley (14) to the Upright (2)

 

 

90

11

 

 

 

 

 

and the Pulley Plate (68) with an M12 x 62mm

 

 

 

 

 

 

 

 

 

Button Bolt (81) and an M12 Nylon Locknut (13).

 

 

13

 

 

Make sure that the Upper Cable (121) is

 

 

 

 

between the two Pulleys.

 

 

68

 

Hold the 38mm Spacer (90) inside the loop of the

81

 

2

14

 

 

 

 

 

Upper Cable (121), and between the Upright (2)

 

 

 

 

 

 

 

 

 

and the Pulley Plate (68). Attach the Spacer with

 

 

 

 

 

an M10 x 58mm Button Screw (11). Make sure

 

 

 

 

 

the ends of the Cable do not wrap around

 

 

 

 

 

each other below the Spacer and the Large

 

 

 

 

 

Pulleys (14) used in steps 8 and 9 (see the

 

 

 

 

 

CABLE DIAGRAM on page 19).

 

 

 

 

 

Tighten the M12 Nylon Locknuts (13) used in

 

 

 

 

 

steps 8 and 9.

 

 

 

 

10.

Attach a Small Guide Spacer (18), a Large Guide

10

 

 

 

 

Spacer (17), and the two Crossbar Guides (15) to

 

 

 

 

 

 

 

 

 

the Upright (2) with an M10 x 152mm Bolt (86).

 

 

 

 

 

Pull the Upper Cable (121) up between the

 

17

 

 

 

Crossbar Guides (15). Press the metal cover on

18

 

 

 

 

 

86

 

the cable into the groove in the Crossbar Block

 

 

 

 

 

 

 

 

(16). Attach a Small Guide Spacer (18), the

 

15

 

 

 

Crossbar Block, the two Crossbar Guides (15), an

 

Metal

 

 

 

 

54

 

M10 Thick Washer (54), and the two Tethers (70)

2

121

Cover

 

to the Upright (2) with another M10 x 152mm Bolt

 

 

 

 

 

 

 

 

 

(86). Do not tighten the Bolt yet.

 

 

 

86

 

 

 

 

 

70

 

 

18

16

Groove

 

 

 

 

 

 

9

Image 9
Contents QUESTIONS? Model No. WESY78734 Serial NoCustomer HOT Line Table of Contents Keep hands and fingers clear of this area Important Precautions Before YOU Begin Make Things Easier for Yourself AssemblyTighten the 1/2 x 25mm Screw Do not tighten the Screw yetDo not overtighten the Locknut the Rail must Be able to pivot easilyPush the excess Upper Wire Harness 71 into the Upright Do not tighten the Bolt yet Do not tighten the Locknut yetPage Rod Slot Upper Cable Adjustment Remove the high pulleys when not in use AdjustmentsUsing the LEG Lever Attaching the High PulleysAttaching the Accessories Attaching the Curl PADAttaching the Curl BAR Adjusting the Squat ARM Adjusting the BackrestAttaching the Squat Station Storing the Resistance System Adjusting the SeatConsole Operation Features of the ConsolePlugging in the Resistance System Manual OperationProgram Operation Upper Cable Cable DiagramCleaning the BAR Guides TroubleshootingAdjusting the Resistance Recalibrating the ConsoleExercise Guidelines Muscle Chart Cooling DownStaying Motivated Date Exercise Weight Sets RepsAerobic Exercise Thursday Aerobic Exercise DatePart Identification CHART-Model No. WESY78734 Key No. Qty Description Part LIST-Model No. WESY78734R1104A Exploded DRAWING-Model No. WESY78734Ordering Replacement Parts Limited WarrantyIcon Health & FITNESS, INC., 1500 S W., LOGAN, UT