13. Pull the upper cable (B), which is attached inside | 13 |
|
|
|
|
|
|
|
of the Mech Assembly (6), up between the |
|
|
|
|
|
|
| B |
Upright (3) and the Pulley Plate (18). |
|
|
|
| 54 | 85 | ||
Attach another Large Pulley (17) between the |
|
|
|
|
| |||
|
|
|
|
|
|
| ||
Upright (3) and Pulley Plate (18) with an M12 x |
|
|
|
|
|
|
|
|
62mm Button Bolt (80) and an M12 Nylon |
| 80 |
|
|
|
| 72 |
|
Locknut (72). Make sure that the upper cable |
|
|
|
|
| 17 | ||
(B) is between the two Pulleys. |
|
|
| 18 |
|
| ||
Hold the 38mm Spacer (54) inside the loop of the | 6 | 3 |
|
|
|
| ||
|
|
|
|
|
| |||
upper cable (B), and between the Upright (3) and |
|
|
|
|
|
| ||
the Pulley Plate (18). Attach the Spacer with an |
|
|
|
|
|
|
|
|
M10 x 58mm Button Screw (85). Make sure the | 14 |
|
|
|
|
|
|
|
ends of the cable do not wrap around each |
|
|
|
|
|
|
| |
other below the Spacer and the Large Pulleys |
|
|
|
|
| 83 |
|
|
(17) used in steps 12 and 13 (refer to the |
|
| 57 | 55 |
|
|
| |
CABLE DIAGRAM on page 18). |
| 56 |
|
|
|
| ||
Tighten the M12 Nylon Locknuts (72) used in |
|
|
| Metal |
|
| ||
steps 12 and 13. |
|
|
|
| 75 | 83 | ||
14. Attach a Small Guide Spacer (56), a Large Guide |
|
|
|
| Cover | |||
Spacer (57), and two Bar Guides (55) to the Lat | 5 55 |
|
|
|
|
|
| |
Tower (5) with an M10 x 152mm Bolt (83). Do not |
|
|
|
|
|
| ||
tighten the Bolt yet. |
|
|
|
|
|
| 61 |
|
Pull the upper cable (B) up between the Bar |
|
|
|
|
|
|
| |
Guides (55). Press the metal cover on the cable |
|
| 58 | B |
|
|
|
|
into the groove in the Block Spacer (58). Attach a |
| 56 |
|
|
|
| ||
Small Guide Spacer (56), the Block Spacer, the |
|
|
|
|
|
|
| |
two Bar Guides, an M10 Thick Washer (75), and |
|
|
|
|
|
|
|
|
the two Tethers (61) to the Lat Tower (5) with | 15 |
|
|
|
|
|
|
|
another M10 x 152mm Bolt (83). Do not tighten | 55 |
|
|
|
|
|
| |
the Bolt yet. |
|
| 61 |
|
|
|
| |
15. Insert the Resistance Bar (9) between the Bar |
|
|
|
|
|
|
| |
Guides (55), and center it on the Block Spacer |
|
|
|
|
|
|
| 71 |
(not shown). |
|
|
|
|
|
|
| |
Press a Pulley Bracket (10) onto the Resistance |
|
|
| 9 |
|
|
|
|
Bar (9). Attach a Tether (61) to the Pulley Bracket |
|
|
|
|
|
| 75 | |
at the upper hole, with an M10 x 63mm Button |
|
|
|
|
|
|
| |
Bolt (82), an M10 Thick Washer (75), and an M10 |
|
|
|
|
|
| 10 |
|
Nylon Locknut (71). |
|
|
| 82 |
|
| ||
Repeat on the other side of the Resistance |
|
|
|
|
|
| ||
|
|
|
|
|
|
|
| |
Bar (9). Then, tighten the M10 x 152mm Bolts | 16 | 10 |
| 72 |
|
|
|
|
(83) used in step 14. |
|
|
|
|
| |||
16. Hold a Large Pulley (17) inside the upper cable |
|
|
|
|
|
|
|
|
(B). Attach the Pulley to a Pulley Bracket (10) |
| 81 |
|
|
|
|
|
|
with an M12 x 58mm Button Bolt (81) and an M12 |
|
|
|
|
|
|
| |
Nylon Locknut (72). Make sure that the cable is |
|
|
|
|
|
|
|
|
routed as shown in the CABLE DIAGRAM on |
|
|
|
|
|
|
|
|
page 18. |
| 17 |
| B |
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
| |
| 11 |
|
|
|
|
|
|
|