Weider WESY49310 user manual Frame Assembly ARM Assembly

Page 8

FRAME ASSEMBLY

ARM ASSEMBLY

9.

Attach the upper ends of the Short Weight

9

61

 

61

 

 

Guides (73) to the Top Frame (55) with a 5/16”

3

 

 

 

 

 

x 6” Bolt (60), two 1/2” x 3/4” Spacers (61), and

 

 

 

 

3

 

a 5/16” Nylon Locknut (3).

60

 

 

 

55

 

 

 

 

 

 

 

Attach the upper ends of the Long Weight

 

 

 

 

 

 

Guides (62) to the Top Frame (55) in the same

 

 

 

 

 

 

manner.

73

 

60

 

 

 

 

 

 

 

 

 

62

 

 

10.

Locate and open the parts bag labeled

10

 

 

95

27

 

“ARM ASSEMBLY.”

 

 

 

 

 

 

 

Be sure there is a Bushing (98) in each side of

 

 

 

 

Welded

 

 

 

 

 

Tube

 

the Stabilizer (5). Press a 2” Square Inner Cap

 

 

 

 

 

 

 

 

 

 

 

(27) into each end of the Leg Press Arm (96).

 

 

 

 

97

 

 

 

 

96

 

 

Lubricate a 3/8” x 3 1/4” Bolt (67). Attach the

 

 

21

 

 

 

 

 

 

 

Leg Press Arm (96) to the Stabilizer (5) with the

 

 

 

 

 

 

Bolt and a 3/8” Nylon Locknut (21). Do not over-

 

 

 

 

67—Lubricate

 

tighten the Nylon Locknut. The Leg Press

 

 

 

 

 

 

 

 

 

 

 

Arm must be able to pivot freely.

 

 

5

27

 

 

 

 

 

 

 

 

 

 

 

 

 

Align the welded tubes on the Leg Press Plate

 

 

 

98

 

 

(95) with one set of holes in the Leg Press Arm

 

 

 

 

 

 

 

 

 

 

 

(96). Attach the Leg Press Plate to the Leg

11

 

 

17

 

 

Press Arm with the Press Pin (97).

 

 

Pulleys

 

 

 

 

 

 

 

 

 

 

must be on

11.

Press a 1” x 7/8” Plastic Bushing (90) onto

 

 

 

 

this side

 

each welded spacer on the Press Frame (17).

 

 

 

 

59—Lubricate

 

Slide the Press Frame into place onto the Base

 

 

 

 

 

(4). Note: This will be a tight fit. The Plastic

 

 

 

 

 

 

Bushings should fit on each end of the indi-

 

 

 

 

 

 

cated tube in the Base. Make sure that the

 

 

 

 

 

 

pulleys are on the side shown.

 

 

21

Welded Spacers

 

 

 

 

 

 

 

 

 

 

Lubricate the 3/8” x 8” Bolt (59). Attach the

4

 

 

 

 

 

Press Frame (17) to the Base (4) with the Bolt

Tube

 

 

90

 

 

and a 3/8” Nylon Locknut (21).

 

 

 

 

 

 

 

 

 

 

8

Image 8
Contents Table of Contents QUESTIONS?Location shown Important PrecautionsApply the decal Dimensions Before YOU BeginAssembly Frame AssemblyFollowing Tools not Included are Required for Assembly Frame AssemblyNylon Locknuts yet Weights 25 until is complete Tighten all Nylon Locknuts used in stepsTube is sitting in the pin grooves in the top Weight Frame Assembly ARM Assembly ARM AssemblyDo not tighten the Nylon Locknut yet 101 Bracket 105 106 107 ARM Assembly Cable Assembly Long Cable Trap is positioned to hold Cable in place Nylon Locknut the Pulley Bracket Must be able to move freely102 Move smoothly Locate the Low Cable 23. Route the LowPulley and the crossbar on the Press Cable Assembly Cable Assembly Must be inserted from the side shown Locate the Leg Press Cable 99. Attach Seat Assembly Locate and open the parts bag labeled Seat AssemblySeat Assembly Seat Assembly Decal HOW to USE the Weight System Changing the Weight SettingAttaching the LEG Lever to the LOW Pulley Station Adjusting the LEG Press PlateAttaching and Removing the Seat Weight Resistance Chart PlatesTROUBLE-SHOOTING and Maintenance Tightening the CablesCable Diagrams High Cable 58 and Low CableHigh Cable Low CableMilitary Press Cable 72 and Leg Press Cable Pivot Arm Leg Press CableWESY49310 R0901A 16 x 3 Bolt Page Part LIST-Model No. WESY49310 Qty DescriptionExploded DRAWING-Model No Icon Health & FITNESS, INC., 1500 S W., LOGAN, UT Ordering Replacement PartsLimited Warranty