48. Wrap the Squat Cable (73) under a 3 1/2” Pulley | 48 |
| |
(78). Attach the Pulley and a Cable Trap to the sec- |
| ||
|
| ||
ond set of holes from the top in the indicated brack- |
|
| |
et on the Long Base (120) with a 3/8” x 2” Bolt |
|
| |
(100) and a 3/8” Nylon Locknut (87). |
| 68 | |
|
| ||
| 73 |
| |
|
| 87 | |
|
| 78 | |
| 100 | 120 | |
49. Wrap the Squat Cable (73) over a 4 1/2” Pulley | 49 |
| |
(119). Attach the Pulley to the indicated bracket on | 6 87 | ||
| |||
the Top Frame (6) with a 3/8” x 1 3/4” Bolt (93) and |
|
| |
a 3/8” Nylon Locknut (87). |
|
| |
| 93 |
| |
|
| 119 | |
|
| 73 |
50. Place a 1/2” Washer (1) on top of the Weight Tube | 50 |
|
|
(43) closest to the Squat Upright (4). Tighten a 1/2” |
|
| |
|
|
| |
Nut (118) halfway onto the end of the Squat Cable |
|
| 4 |
(73). |
|
| |
|
| 73 | |
|
|
| |
Lift the Weight Tube (43) and the Top Weight (45) |
|
|
|
and make sure that the small pin on the Weight |
|
| 118 |
Tube is inside of the groove under the Top Weight. |
|
| 1 |
|
|
| |
Hold the Weight Tube (43) and the Top Weight (45) |
|
| 45 |
|
|
| |
a few inches over the weight stack while you screw |
|
| 43 |
the end of the Cable (73) two full turns into the |
|
| |
Weight Tube. Then, tighten the Nut against the 1/2” |
|
|
|
Washer (1). |
|
|
|
SEAT ASSEMBLY | 51 | 19 |
|
|
| ||
| 109 |
| 23 |
51. Locate and open the parts bag labeled “SEAT |
|
| |
|
| 9 19 | |
ASSEMBLY.” |
|
| |
Insert the Pad Tube (23) into the square hole in the |
|
|
|
Seat Upright (9). Slide the two Knee Pads (19) onto |
|
|
|
the Pad Tube as shown. Press the two Knee Pad |
|
|
|
Caps (109) into the ends of the Pad Tube. |
| 20 | 109 |
|
| ||
|
|
| |
Slide two Short Pads (20) onto the Leg Lever (10). |
|
| 10 |
|
|
| |
|
|
| 20 |
19