Grindmaster 87710 service manual Operation Malfunction and Service

Page 10

Operation Malfunction and Service

Problem - Thermostat dial turned to brew and water in tank remains cold.

Possible Cause

1.No power at urn.

2.Power at urn, but no power at heater terminals.

3.Power at heater terminals, but no heat.

Service Checks and Cures

Check main switch. Check main fuses. (Three on 3 phase power, two on single phase power). Check that pilot light at top of thermostat bezel is ON.

Check urn control circuit breaker or fuse, reset or replace if needed. Check that water level is at STOP mark on gauge. Check that power contractor has power at coil, and clicks open and closed at thermostat dial is turned off and to BREW position. Check control transformer, if supplied. It may be burned out. Lastly, check for voltage at heater terminals. If voltage at heater is O.K., check for broken or loose wire. Water must be showing in center gauge glass 2” if Opt. 39 equipped.

Check heater for an open circuit with ohmmeter or continuity tester. If necessary, replace heater. (It is necessary to remove coffee liner to replace electric heater).

PROBLEM: Water boils continuously with thermostat dial on position “BREW” or “HOLD.”

Possible Cause

Service Checks and Cures

1. Thermostat out of calibration.

Set knob on “BREW” and remove knob by

 

pulling outward. Using small screwdriver in

 

center of shaft, turn slotted screw clockwise

 

until pilot light goes out. Check holding

 

temperature by adding cold water. Light

 

should come on and water heat up to high

 

end of “BREW” zone on thermometer dial

 

and then shut off. NO BOILING.

2. Thermostat is inoperative.

If impossible to get control to cycle on and

Fluid has leaked out of

off and control temperature, replace entire

diastat assembly of thermostat.

control. Be sure to drain water in urn below

 

level at which bulb enters urn. Also, shut off

 

all power before service is attempted.

3. Contractor sticking in

Contactor must click on and off. If it sticks,

closed position.

replace.

 

 

American Metal Ware 87710E Coffee Urn

Page 11

Image 10
Contents High Speed Brewing Urn Top Line General Description American Metal Ware 87710E Coffee Urn Installation Timer Adjustment Spray-Over Time Volume RateOperation Start-Up Checks/Brew Cycle Adjustments How To Brew In An Automatic Urn Explanation Of Brewing CycleThermostat Thermostat AdjustmentPush Button Timer For Spray Over Control Spray Rinse Of LinerCare and Cleaning of Coffee Urn Semi-Weekly Cleaning ProcedureSolid State Coffee Agitation System Automatic Program End of Brew and Delayed TypesManual Agitation Operation Malfunction and Service Dual Level Control Auto Refill And Low Water Cutoff System OFF Metal American Metal Ware 87710E Coffee Urn American Metal Ware 87710E Coffee Urn Service/Troubleshooting Solid State Air Agitation Installation Installation and Service Instructions53.20.10 Alco Controls Division Emerson Electric Co 093-011 American Metal Ware 87710E Coffee Urn List of Illustrated Parts Electric Heat Only 87710E PartsSteam Heat Only American Metal Ware 87710E Coffee Urn American Metal Ware 87710E Coffee Urn American Metal Ware 87710E Coffe Urn