Grindmaster 87710 service manual Installation

Page 4

Installation

1.IMPORTANT TO ALLOW 6” CLEAR SPACE FOR ACCESS TO CONTROL BOX. Urn should be level, both front to back and left to right.

2.CONNECT WATER LINE. 3/8” NPT water inlet located at left end and provide shutoff valve and union in supply line near urn. 140OF. hot water must be used, 30PSI mini- mum - 70PSI maximum. We strongly recommend the use of copper or aluminum tub- ing to provide flexibility and avoid strain on the urn. 3/8” O.D. minimum tubing is rec- ommended.

Model No.

87710

Actual Coffee Capacity Each Liner

10

Gal.

Water Compartment Capacity

24

Gal.

Brew Capacity, Gals. per Hour

80

 

Electric Supply Voltage

240V/208V

1

Phase Heater Size

15KW / 15KW

1

Phase Amperes

63

/ 72

3

Phase Heater Size

15KW / 15KW

3

Phase Amperes

36

/ 42

3.CONNECT URN TO ELECTRIC POWER. Check to be sure that the nameplate mark- ing of voltage, phase and the number of wires matches supply lines. Remove cover on control housing. The terminal block for the line connections is located in the housing on the left end. See drawing, as required. It is recommended that a fused disconnect switch be installed near urn. The urn body must be grounded either through metallic conduit or else by means of ground wire. An experienced electrician should be respon- sible for the installation of the urn, and its associated supply line. NOTE: Neutral wire required on all single phase and on 208 volt 3 phase power supplies to operate 120 volt AC control circuit.

On single phase, 2 wire service (no neutral) or 3 phase 3 wire service (no neutral) 120 volt AC power to operate control circuit must be supplied as circuit. Do not replace cover until completing installation start-up.

4.FILL WATER COMPARTMENT. Turn on water supply and electric service to urn. Water compartment should fill to stop-full level in approximately 10 minutes.

Turn thermostat knob to BREW position. Pilot light over knob should light showing heater power on. Water compartment should reach operating temperature approxi- mately 45 minutes later. When the pointer on thermometer approaches the “W” in the blue BREW zone, urn is ready for automatic operation.

 

 

American Metal Ware 87710E Coffee Urn

Page 5

Image 4
Contents High Speed Brewing Urn Top Line General Description American Metal Ware 87710E Coffee Urn Installation Timer Adjustment Spray-Over Time Volume RateOperation Start-Up Checks/Brew Cycle Adjustments How To Brew In An Automatic Urn Explanation Of Brewing CycleThermostat Adjustment Push Button Timer For Spray Over ControlThermostat Spray Rinse Of LinerCare and Cleaning of Coffee Urn Semi-Weekly Cleaning ProcedureSolid State Coffee Agitation System Automatic Program End of Brew and Delayed TypesManual Agitation Operation Malfunction and Service Dual Level Control Auto Refill And Low Water Cutoff System OFF Metal American Metal Ware 87710E Coffee Urn American Metal Ware 87710E Coffee Urn Service/Troubleshooting Solid State Air Agitation Installation Installation and Service Instructions53.20.10 Alco Controls Division Emerson Electric Co 093-011 American Metal Ware 87710E Coffee Urn List of Illustrated Parts Electric Heat Only 87710E PartsSteam Heat Only American Metal Ware 87710E Coffee Urn American Metal Ware 87710E Coffee Urn American Metal Ware 87710E Coffe Urn