IMPORTANT: For extended duct work runs, the cross section area of the duct work can only be increased to an extent. When the duct work approaches the maximum limits noted in this manual, a professional heating venting air conditioning (HVAC) firm should be consulted for proper venting information.

ALL duct work should be smooth inside with no projections from sheet metal screws or other obstructions which will collect lint. When adding ducts, the duct to be added should overlap the duct to which it is to be connected. ALL duct work joints must be taped to prevent moisture and lint from escaping into the building. Inspection doors should be installed at strategic points in the exhaust duct work for periodic inspection and clean-out of lint from the duct work.

NOTE: Where the exhaust duct passes through a wall, ceiling, or roof made of combustible materials, the opening must be 2-inches larger (all the way around) than the duct. The duct must be centered within this opening.

a.Outside Duct Work Protection

1)To protect the outside end of horizontal duct work from the weather, a 90° elbow bent downward should be installed where the exhaust exits the building. If the duct work travels vertically up through the roof, it should be protected from the weather by using a 180° turn to point the opening downward. In either case, allow at least twice the diameter of the duct between the duct opening and the nearest obstruction.

IMPORTANT: DO NOT use screens or caps on the outside of opening of exhaust duct work.

16

Image 20
Contents MDG-75 Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Section Important InformationSafety Precautions What to do if YOU Smell GASPage SPECIFICATIONS/COMPONENT Identification SpecificationsSpecifications Component Identification Dryer Rear View Illus. No Installation Procedures Location RequirementsUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Supply Exhaust Requirements Not be Reduced Anywhere Down Stream of the Dryer Page Page Electrical Information MDG-75 GAS Page 3+$6 ‘ /&75,&$/&211&7,216/$6 Page Page GAS Information 48, 3523$1 Page Page Preparation for OPERATION/START-UP Preoperational Tests Gas DryersPage Preoperational Instructions Shut Down Instructions Parts SERVICE/PARTS InformationService Warranty Information Returning Warranty CardsRoutine Maintenance CleaningDays Adjustments Days After Installation and Every 6 Months ThereafterProcedure for Functional Check Replacement Components Page Page Reversing Timer Spin and Dwell Adjustments 1* /*1’Technical Information Data LabelApplicable Approval Seals Troubleshooting From the Machine Toallowaccess for CLEANING,ADJUSTING70 3$ Microprocessor Computer Models Blower and Fan motor is not operating does not start Loose connection in main door switch circuit Page GAS Models Failed microprocessor controller computer Dryer operates but is taking too long to dry Page AA. Condensation on main door glass Timer Models Blower/Fan motor is not operating does not start Page Dryer operates but is taking too long to dry Page Condensation on main door glass Page 01/07/998-50