Consistent gas pressure is essential at ALL gas connections. It is recommended that a 3/4-inch pipe gas loop be installed in the supply line serving a bank of dryers. An in-line pressure regulator must be installed in the gas supply line (header) if the (natural) gas pressure exceeds 12.0 inches of water column (W.C.) pressure.

NOTE: A water column (W.C.) test pressure of a consistent 3.5 -inches for natural gas and a consis- tent of 10.5-inches for L.P. (liquid propane) dryers is required at the gas valve pressure tap of each dryer for proper and safe operation.

A1/8" N.P.T. plugged tap, accessible for a test gauge connection, must be installed in the main gas supply line immediately upstream of each dryer.

IMPORTANT: Pipe joint compounds that resist the action of natural gas and L.P. gas must be used.

IMPORTANT: Test ALL connections for leaks by brushing on a soapy water solution (liquid detergent works well).

WARNING: NEVER TEST FOR LEAKS WITH A FLAME!

ALL components and materials must conform to National Gas Code specifications. It is important that gas pressure regulators meet applicable pressure requirements and that gas meters be rated for the total amount of ALL the appliance BTU's being supplied.

IMPORTANT: The dryer and its individual shut-off valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1/2 psig (3.5 kPa).

NOTE: The dryer must be isolated from the gas supply piping system by closing its individual manual shut-off valve during any pressure test of the gas supply system at test pressures equal to or less than 1/2 psig (3.5 kPa).

27

Image 31
Contents MDG-75 Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Important Information SectionWhat to do if YOU Smell GAS Safety PrecautionsPage Specifications SPECIFICATIONS/COMPONENT IdentificationSpecifications Component Identification Dryer Rear View Illus. No Location Requirements Installation ProceduresUNPACKING/SETTING UP Dryer Enclosure Requirements Fresh AIR Supply Exhaust Requirements Not be Reduced Anywhere Down Stream of the Dryer Page Page Electrical Information MDG-75 GAS Page 3+$6 ‘ /&75,&$/&211&7,216/$6 Page Page GAS Information 48, 3523$1 Page Page Preparation for OPERATION/START-UP Gas Dryers Preoperational TestsPage Preoperational Instructions Shut Down Instructions Service SERVICE/PARTS InformationParts Returning Warranty Cards Warranty InformationCleaning Routine MaintenanceDays Days After Installation and Every 6 Months Thereafter AdjustmentsProcedure for Functional Check Replacement Components Page Page 1* /*1’ Reversing Timer Spin and Dwell AdjustmentsData Label Technical InformationApplicable Approval Seals From the Machine Toallowaccess for CLEANING,ADJUSTING Troubleshooting70 3$ Microprocessor Computer Models Blower and Fan motor is not operating does not start Loose connection in main door switch circuit Page GAS Models Failed microprocessor controller computer Dryer operates but is taking too long to dry Page AA. Condensation on main door glass Timer Models Blower/Fan motor is not operating does not start Page Dryer operates but is taking too long to dry Page Condensation on main door glass Page 01/07/998-50