American Dryer Corp ADG-78 II installation manual Dryer Enclosure Requirements

Page 16

C. DRYER ENCLOSURE REQUIREMENTS

Bulkheads and partitions should be made of noncombustible materials and must be located a minimum of twelve (12) inches (18-inches) or more is recommended for ease of installation, maintenance, and service) above the dryer outer top, except along the front of the dryer which may be partially closed in if desired. The clearance between the bulkhead header and the dryer must be a minimum of four (4) inches and must not extend more than four (4) inches to the rear of the front. The bulkhead facing must not be closed in all the way to the top of the dryer. A one (1) inch clearance is required.

NOTE: Allowances must be made for opening the control door.

Dryers may positioned side wall to side wall. However, a 1/16" minimum allowance must be made for opening and closing of the control door and the lint door. It is suggested that the dryer be positioned about two (2) feet away from the nearest obstruction for ease of installation, maintenance, and service (to be measured from the back guard. (Refer to the illustration above for details.)

NOTE: Air considerations are important for proper and efficient operation.

12

Image 16
Contents ADG-78 Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Routine Maintenance Section Important InformationSafety Precautions What to do if YOU Smell GASNational Electric Code ANSI/NFPA no -LATEST Edition SPECIFICATIONS/COMPONENT Identification SpecificationsSpecifications Component Identification Page Installation Procedures Location RequirementsUNPACKING/SETTING UP Bracket Before Starting the DryerDryer Enclosure Requirements Fresh AIR Supply Page Exhaust Requirements Reduced Anywhere Down Stream of the Dryer Reduced Anywhere Down Stream of the Dryer Page Electrical Information ADG-78 II Gas Page Black Positive White Neutral Green Ground Page GAS Information Type of GAS Page Page Preparation for OPERATION/START-UP Preoperational Tests Page Preoperational Instructions Shut Down InstructionsService SERVICE/PARTS InformationParts Returning Warranty Cards Warranty InformationReturning Warranty Parts Page Routine Maintenance CleaningAdjustments DaysData Label LOCATION/INFORMATION Data LabelSerial Number Procedure for Functional Check Replacement Components Burner flame must shut off immediately ADC 113101 1- 09/01/99-30