Consistent gas pressure is essential at ALL gas connections. It is recommended that a 2-inch pipe gas loop be installed in the supply line serving a bank of dryers. An in-line pressure regulator must be installed in the gas supply line (header) if the (natural) gas pressure exceeds 12.0 inches of water column pressure.

NOTE: A water column test pressure of 3.5 inches for natural gas and 10.5 inches for L.P. (liquid propane) dryers is required at the gas valve pressure tap of each dryer for proper and safe operation.

A1/8" N.P.T. plugged tap, accessible for a test gauge connection, must be installed in the main gas supply line immediately upstream of each dryer.

IMPORTANT: Pipe joint compounds that resist the action of natural gas and L.P. gas must be used.

IMPORTANT: Test ALL connections for leaks by brushing on a soapy water solution (liquid detergent works well).

WARNING: NEVER TEST FOR LEAKS WITH A FLAME!!!

ALL components/materials must conform to National Gas Code specifications. It is important that gas pressure regulators meet applicable pressure requirements and that gas meters be rated for the total amount of ALL the appliance BTU's being supplied.

IMPORTANT: The dryer and its individual shut-off valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1/2 psig (3.5 kPa).

NOTE: The dryer must be isolated from the gas supply piping system by closing its individual manual shut-off valve during any pressure test of the gas supply system at test pressures equal to or less than 1/2 psig (3.5 kPa).

27

Image 31
Contents ADG-78 Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Routine Maintenance Important Information SectionWhat to do if YOU Smell GAS Safety PrecautionsNational Electric Code ANSI/NFPA no -LATEST Edition Specifications SPECIFICATIONS/COMPONENT IdentificationSpecifications Component Identification Page Location Requirements Installation ProceduresBracket Before Starting the Dryer UNPACKING/SETTING UPDryer Enclosure Requirements Fresh AIR Supply Page Exhaust Requirements Reduced Anywhere Down Stream of the Dryer Reduced Anywhere Down Stream of the Dryer Page Electrical Information ADG-78 II Gas Page Black Positive White Neutral Green Ground Page GAS Information Type of GAS Page Page Preparation for OPERATION/START-UP Preoperational Tests Page Shut Down Instructions Preoperational InstructionsService SERVICE/PARTS InformationParts Returning Warranty Cards Warranty InformationReturning Warranty Parts Page Cleaning Routine MaintenanceDays AdjustmentsData Label Data Label LOCATION/INFORMATIONSerial Number Procedure for Functional Check Replacement Components Burner flame must shut off immediately ADC 113101 1- 09/01/99-30