American Dryer Corp ADG-78 II installation manual Electrical Information

Page 23

F.ELECTRICAL INFORMATION

1.Electrical Requirements

It is your responsibility to have ALL electrical connections made by a properly licensed and competent electrician to assure that the electrical installation is adequate and conforms with local and state regulations or codes. In the absence of such codes, ALL electrical connections, material, and workmanship must conform to the applicable requirements of the National Electrical Code ANSI/NFPA NO.70-LATEST EDITION..

IMPORTANT: Failure to comply with these codes or ordinances, and/or the requirements stipulated in this manual can result in personal injury or component failure.

NOTE: Component failure due to improper installation will VOID THE WARRANTY.

Each dryer should be connected to an independently protected branch circuit. THE DRYER MUST BE CONNECTED WITH COPPER WIRE ONLY. DO NOT use aluminum wire which could cause a fire hazard. The copper conductor wire/cable must be of proper ampicity and insulation in accordance with electric codes for making ALL service connections.

NOTE: The use of aluminum wire will VOID THE WARRANTY.

IMPORTANT: A separate circuit servicing each dryer must be provided.

19

Image 23
Contents ADG-78 Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Routine Maintenance Important Information SectionWhat to do if YOU Smell GAS Safety PrecautionsNational Electric Code ANSI/NFPA no -LATEST Edition Specifications SPECIFICATIONS/COMPONENT IdentificationSpecifications Component Identification Page Location Requirements Installation ProceduresBracket Before Starting the Dryer UNPACKING/SETTING UPDryer Enclosure Requirements Fresh AIR Supply Page Exhaust Requirements Reduced Anywhere Down Stream of the Dryer Reduced Anywhere Down Stream of the Dryer Page Electrical Information ADG-78 II Gas Page Black Positive White Neutral Green Ground Page GAS Information Type of GAS Page Page Preparation for OPERATION/START-UP Preoperational Tests Page Shut Down Instructions Preoperational InstructionsParts SERVICE/PARTS InformationService Returning Warranty Parts Warranty InformationReturning Warranty Cards Page Cleaning Routine MaintenanceDays AdjustmentsData Label Data Label LOCATION/INFORMATIONSerial Number Procedure for Functional Check Replacement Components Burner flame must shut off immediately ADC 113101 1- 09/01/99-30