American Dryer Corp ML-82 III Procedure for Functional Check Replacement Components

Page 42

SECTION VII

PROCEDURE FOR FUNCTIONAL CHECK

OF REPLACEMENT COMPONENTS

1.Microprocessor Controller (Computer) Board

a.Upon completing installation of the replacement microprocessor controller (computer) board, reestablish power to the dryer.

b.Start the drying cycle by pressing any of the preset cycles in letters A-F.

c.Verify that the applicable indicator lights on the back side of the microprocessor controller (computer) board are lit. (Refer to the illustration below.)

38

American Dryer Corp.

113344 - 9

Image 42
Contents ML-82 III Installation Manual ML-82 For Your Safety Page Table of Contents Safety Precautions SectionStandards SPECIFICATIONS/COMPONENT Identification SpecificationsSpecifications Component Identification 113344 Installation Procedures Location RequirementsUNPACKING/SETTING UP This Exhaust Duct Transition Piece Must be Installed FirstDryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements General Exhaust Ductwork Information113344 American Dryer Corp 113344 113344 Electrical Information Electrical RequirementsGas and Steam GAS Information Type of GAS Type of GAS 113344 Operating Steam Pressure Steam Information113344 Compressed Air Pressure Air Supply Fire Suppression System Before YOU Start Check Local Codes and PermitsAmerican Dryer Corp 113344 Typical water supply Preparation for OPERATION/START-UP Preoperational Test Basket Tumbler Coating Preoperational Instructions Shutdown InstructionsSERVICE/PARTS Information ServiceParts Warranty Warranty InformationReturning Warranty Cards Returning Warranty PartsAmerican Dryer Corp 113344 Routine Maintenance CleaningSuggested Cleaning Schedule Adjustments LubricationLint Drawer Removal Procedure for Functional Check Replacement Components 113344 Sectionviii Data Label InformationManual Reset Burner HI-LIMIT Instructions PhaseDual Timer ADC Part No 09/04/08