American Dryer Corp ML-82 III installation manual Fire Suppression System

Page 29

5.Steam Damper Air Piston (Flow Control) Operation Adjustment

Although the damper operation was tested and adjusted prior to shipping at 80 psi (5.51 bar), steam damper operation must be checked before the dryer is put into operation. Refer to page 29 for instructions to check steam damper operation. If damper air adjustment is necessary, locate flow control valve and make necessary adjustments as noted below.

I. FIRE SUPPRESSION SYSTEM

BEFORE YOU START!

CHECK LOCAL CODES AND PERMITS

Call your local water company or the proper municipal authority for information regarding local codes.

IMPORTANT: It is your responsibility to have ALL plumbing connections made by a qualified professional to assure that the plumbing installation is adequate and conforms to local, state, and federal regulations or codes.

IMPORTANT: It is the installer’s or owner’s responsibility to see that the necessary or required water, water pressure, pipe size, or connections are provided. Manufacturer assumes no responsibility if the fire suppression system is not connected, installed, or maintained properly.

113344 - 9

www.amdry.com

25

Image 29
Contents ML-82 III Installation Manual ML-82 For Your Safety Page Table of Contents Section Safety PrecautionsStandards Specifications SPECIFICATIONS/COMPONENT IdentificationSpecifications Component Identification 113344 Location Requirements Installation ProceduresThis Exhaust Duct Transition Piece Must be Installed First UNPACKING/SETTING UPDryer Enclosure Requirements Fresh AIR Supply Requirements General Exhaust Ductwork Information Exhaust Requirements113344 American Dryer Corp 113344 113344 Electrical Requirements Electrical InformationGas and Steam GAS Information Type of GAS Type of GAS 113344 Steam Information Operating Steam Pressure113344 Compressed Air Pressure Air Supply Before YOU Start Check Local Codes and Permits Fire Suppression SystemAmerican Dryer Corp 113344 Typical water supply Preparation for OPERATION/START-UP Preoperational Test Basket Tumbler Coating Shutdown Instructions Preoperational InstructionsParts SERVICE/PARTS InformationService Returning Warranty Cards Warranty InformationWarranty Returning Warranty PartsAmerican Dryer Corp 113344 Suggested Cleaning Schedule Routine MaintenanceCleaning Lubrication AdjustmentsLint Drawer Removal Procedure for Functional Check Replacement Components 113344 Data Label Information SectionviiiDual Timer Manual Reset Burner HI-LIMIT InstructionsPhase ADC Part No 09/04/08