American Dryer Corp ML-82 III installation manual GAS Information

Page 22

For gas and steam dryers manufactured for operation at 3-phase (3ø), the electrical connections are made at the power distribution block located in the service box at the rear, upper left hand corner of the dryer. To gain access to the service box and contactor, the service box cover must be removed.

Providing local codes permit, power to the dryer can be made by the use of a flexible U.L. listed cord or pigtail (wire size must conform to the rating of the dryer), or the dryer can be hard wired directly to the service breaker. In ALL cases, a strain relief should be used both where the wiring enters the dryer and the service box.

G. GAS INFORMATION

It is your responsibility to have ALL plumbing connections made by a qualified professional to assure that the gas plumbing installation is adequate and conforms to local and state regulations or codes. In the absence of such codes, ALL plumbing connections, materials, and workmanship must conform to the applicable requirements of the National Fuel Gas Code ANSI Z223.1-LATEST EDITION, or in Canada, the Canadian Installation Codes CAN/CGA-B149.1-M91 (Natural Gas) or CAN/CGA-B149.2-M91 (Liquid Propane [L.P.] Gas) or LATEST EDITION.

IMPORTANT: Failure to comply with these codes or ordinances, or the requirements stipulated in this manual, can result in personal injury and improper operation of the dryer.

The dryer and its individual shutoff valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1/2 psig (3.5 kPa). The dryer must be isolated from the gas supply piping system by closing its individual manual shutoff valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1/2 psig (3.5 kPa).

18

American Dryer Corp.

113344 - 9

Image 22
Contents ML-82 III Installation Manual ML-82 For Your Safety Page Table of Contents Safety Precautions SectionStandards SPECIFICATIONS/COMPONENT Identification SpecificationsSpecifications Component Identification 113344 Installation Procedures Location RequirementsUNPACKING/SETTING UP This Exhaust Duct Transition Piece Must be Installed FirstDryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements General Exhaust Ductwork Information113344 American Dryer Corp 113344 113344 Electrical Information Electrical RequirementsGas and Steam GAS Information Type of GAS Type of GAS 113344 Operating Steam Pressure Steam Information113344 Compressed Air Pressure Air Supply Fire Suppression System Before YOU Start Check Local Codes and PermitsAmerican Dryer Corp 113344 Typical water supply Preparation for OPERATION/START-UP Preoperational Test Basket Tumbler Coating Preoperational Instructions Shutdown InstructionsService SERVICE/PARTS InformationParts Warranty Warranty InformationReturning Warranty Cards Returning Warranty PartsAmerican Dryer Corp 113344 Cleaning Routine MaintenanceSuggested Cleaning Schedule Adjustments LubricationLint Drawer Removal Procedure for Functional Check Replacement Components 113344 Sectionviii Data Label InformationPhase Manual Reset Burner HI-LIMIT InstructionsDual Timer ADC Part No 09/04/08