American Dryer Corp MLG32PDB Dryer Enclosure Requirements, Fresh AIR Supply Requirements

Page 14

C. DRYER ENCLOSURE REQUIREMENTS

Bulkheads and partitions should be made of noncombustible materials and must be located a minimum of 12-inches (18-inches or more is recommended for ease of installation, maintenance, and service) above the dryer outer top, except along the front of the dryer, which may be closed in if desired.

NOTE: Even though a minimum of 12-inches above the dryer outer top is acceptable, a clearance of 18-inches (or more) is suggested for ease of installation and service (electrical power connections).

NOTE: When fire sprinkler systems are located above the dryers, a minimum of 12-inches above the dryer outer top is required.

NOTE: Allowances must be made for opening the control door.

Dryers may be positioned sidewall to sidewall. However, allowances must be made for opening and closing of the control door and the lint door. It is suggested that the dryer be positioned about 2 feet away from the nearest obstruction for ease of installation, maintenance, and service (to be measured from the back guard.) Refer to the illustration on the previous page for details.

NOTE: Air considerations are important for proper and efficient operation.

D. FRESH AIR SUPPLY REQUIREMENTS

Air supply (make-up air) must be given careful consideration to assure proper performance of each dryer. An unrestricted source of 840 cfm is necessary for each dryer. An unrestricted air entrance from the outdoors (atmosphere) of a minimum of 1-1/2 square feet is required for each dryer. This area must be enlarged if louvers or registers cover the opening. It is not necessary to have a separate make-up air opening for each dryer. Common make-up air openings are acceptable. However, they must be set up in such a manner that the make-up air is distributed equally to the dryers. For example, for a bank of eight (8) dryers, a total make-up air opening of 12 square feet is required. Two (2) openings measuring 2 feet by 3 feet (6 square feet) are acceptable. (Refer to the illustration on the next page.)

Allowances must be made for remote or constricting passageways or where dryers are located at excessive altitudes or predominantly low-pressure areas. The dryer must be installed with provisions for adequate combustion and make-up air supply.

IMPORTANT: Make-up air must be provided from a source free of dry cleaning solvent fumes. Make-up air that is contaminated by dry cleaning solvent fumes will result in irreparable damage to the motors and other dryer components.

10

Maytag Co.

113062 - 16

Image 14
Contents MLG32PDB Installation Manual Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Warranty Information Important Information Receiving and HandlingSafety Precautions What to do if YOU Smell GASMaytag Co Specifications SpecificationsSpecifications Location of the Dryer Installation ProceduresUNPACKING/SETTING UP Maytag Co Dryer Enclosure Requirements Fresh AIR Supply RequirementsMaytag Co Exhaust Requirements Gauge 0.0195-inches 0.50 mm thick Maytag Co 113062 Maytag Co Electrical Information Electrical RequirementsSingle-Phase 1Ø Electrical Connection Leads Electrical Service Specifications PER Tumbler GAS Information Type of GAS Maytag Co Preparation for Operation Preoperational TestsNatural Gas Inches Water Column Liquid Propane L.P. Gas Shutdown Instructions Basket Tumbler CoatingOperating Instructions Starting the DryerParts SERVICE/PARTS InformationService Warranty Warranty InformationReturning Warranty Cards Suggested Cleaning Schedule Routine MaintenanceCleaning Adjustments LubricationDryer Data Label Information Data Label LocationData Label 16 08/08/08