American Dryer Corp MLG32PDB Natural Gas Inches Water Column Liquid Propane L.P. Gas

Page 27

3)Start the dryer by pressing the desired fabric setting. After the cycle is started, drying time will count down whether the door is closed or open.

NOTE: The dryer can be stopped at any time by opening the main door. To restart dryer, shut the main door and press desired fabric setting.

4)Open main door to stop the dryer, and change to a different fabric setting. Repeat this procedure, until ALL fabric selections have been tested. This will also confirm that setting key circuits and door switch circuits are functioning properly.

5)Repeat above procedure for the other basket (tumbler).

2.Heat Circuit Operational Test

a.When a gas dryer is first started (during initial start-up), it has a tendency not to ignite on the first ignition attempt. This is because the gas supply piping is filled with air, so it may take a few minutes for the air to be purged from the lines.

NOTE: During the purging period, check to be sure that ALL gas shutoff valves are open.

NOTE: Gas dryers are equipped with a Direct Spark Ignition (DSI) system, which has internal diagnostics. If ignition is not established after the first attempt, the heat circuit in the DSI module will lockout until it is manually reset. To reset the DSI system, open and close the main door and restart the dryer.

b.Once ignition is established, a gas pressure test should be taken at the gas valve pressure tap of each dryer to assure that the water column (W.C.) pressure is correct and consistent.

NOTE: Water column pressure requirements (measured at the pressure tap of the gas valve body):

Natural Gas

3.5 Inches Water Column.

Liquid Propane (L.P.) Gas ....

10.5 Inches Water Column.

IMPORTANT: There is no regulator provided in an L.P. dryer. The water column pressure must be regulated at the source (L.P. tank) or an external regulator must be added to each dryer.

3.Make a complete operational check of ALL the operating controls to ensure that the timing is correct and that the temperatures are set properly.

4.Make a complete operational check of ALL safety related circuits (i.e., door switches, hi-limit thermostats, sail switches, basket [tumbler] safety thermostats, etc.).

NOTE: The sail switch can be checked for proper operation by opening the control door while the dryer is running and the heating unit (burner) is active (on). The heating unit(s) should shut off within a few seconds. If not, make the necessary adjustments.

5.Each basket (tumbler) should be operated through one (1) complete cycle to assure that no further adjustments are necessary and that ALL components are functioning properly.

113062 - 16

Maytag Co.

23

Image 27
Contents MLG32PDB Installation Manual Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Warranty Information Receiving and Handling Important InformationWhat to do if YOU Smell GAS Safety PrecautionsMaytag Co Specifications SpecificationsSpecifications Installation Procedures UNPACKING/SETTING UPLocation of the Dryer Maytag Co Fresh AIR Supply Requirements Dryer Enclosure RequirementsMaytag Co Exhaust Requirements Gauge 0.0195-inches 0.50 mm thick Maytag Co 113062 Maytag Co Electrical Requirements Electrical InformationSingle-Phase 1Ø Electrical Connection Leads Electrical Service Specifications PER Tumbler GAS Information Type of GAS Maytag Co Preoperational Tests Preparation for OperationNatural Gas Inches Water Column Liquid Propane L.P. Gas Basket Tumbler Coating Shutdown InstructionsStarting the Dryer Operating InstructionsSERVICE/PARTS Information ServiceParts Warranty Information Returning Warranty CardsWarranty Routine Maintenance CleaningSuggested Cleaning Schedule Lubrication AdjustmentsData Label Location Dryer Data Label InformationData Label 16 08/08/08