American Dryer Corp MLG31PCB installation manual Dryer Enclosure Requirements

Page 13

8.Dryer must be located in an area where correct exhaust venting can be achieved as noted in this manual (refer to Exhaust Requirements in Section E).

IMPORTANT: Dryer should be located where a minimum amount of exhaust duct will be necessary.

9.The dryer must be installed with a proper exhaust duct connection to the outside.

10.The dryer must be installed with provisions for adequate combustion and make-up air supply.

CAUTION: This dryer produces combustible lint and must be exhausted to the outdoors. Every 6 months, inspect the exhaust ducting and remove any lint build up.

C. DRYER ENCLOSURE REQUIREMENTS

Bulkheads and partitions should be made of noncombustible materials and must be located a minimum of 12-inches (30.48 cm [18-inches [45.72 cm] or more is recommended for ease of installation, maintenance, and service]) above the dryer’s outer top, except along the front of the dryer which may be closed in if desired.

NOTE: Even though a minimum of 12-inches (30.48 cm) above the dryer’s outer top is acceptable, a clearance of 18-inches (45.72 cm) or more is suggested for ease of installation and service (electrical power connections).

NOTE: When fire sprinkler systems are located above the dryers, a minimum of 12-inches (30.48 cm) above the dryer’s outer top is required.

NOTE: Allowances must be made for the opening of the control door.

Dryers may be positioned sidewall to sidewall. However, allowances must be made for the opening and closing of the control door and the lint door. It is suggested that the dryer be positioned about 2 feet (0.61 meters) away from the nearest obstruction for ease of installation, maintenance, and service (to be measured from the back guard). Refer to the illustration on the previous page for details.

NOTE: Air considerations are important for proper and efficient operation.

113203-3

Maytag

9

Image 13
Contents MLG31PCB Installation Manual MLG31PCB For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Section Safety PrecautionsStandard GAS SpecificationsSpecifications GAS only UNPACKING/SETTING UP Installation ProceduresLocation of the Dryer Maytag 113203-3 Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Maytag 113203-3 Maytag Maytag 113203-3 Maytag Maytag 113203-3 Maytag Electrical Requirements Electrical InformationElectrical Service Specifications PER Pocket GAS only GAS Information Type of GAS Typical GAS Connections Maytag Maytag 113203-3 Preoperational Tests Preparation for OperationMaytag 113203-3 Basket Tumbler Coating Shutdown Instructions Operating Instructions Coin ModePause Mode Free ModeRPM Clearing CREDIT/CLEARING Cycle Accessing Coin VaultWrinkle Guard Service SERVICE/PARTS InformationParts Returning Warranty Cards Warranty InformationWarranty Cleaning Routine MaintenanceSuggested Cleaning Schedule Lubrication AdjustmentsData Label Information Keyboard Touch PAD Layout Procedure for Functional Check Replacement ComponentsMaytag 113203-3 Optional Gas Piping Kit 03/15/05-14