American Dryer Corp MLG31PCB installation manual Fresh AIR Supply Requirements

Page 14

D. FRESH AIR SUPPLY REQUIREMENTS

Air supply (make-up air) must be given careful consideration to ensure proper performance of each dryer. An unrestricted source of 800 cfm (22.65 cmm) is necessary for each dryer. An unrestricted air entrance from the outdoors (atmosphere) of a minimum of 1-1/2 square feet (0.14 square meters) is required for each dryer. This area must be enlarged if louvers or registers cover the opening. It is not necessary to have a separate make-up air opening for each dryer. Common make-up air openings are acceptable. However, they must be set up in such a manner that the make-up air is distributed equally to the dryers. For example, for a bank of eight

(8)dryers, a total make-up air opening of 12 square feet (1.15 square meters) is required. Two (2) openings measuring 2 feet by 3 feet (0.61 meters by 0.91 meters [6 square feet] [0.56 square meters]) are acceptable. The dryer must be installed with provisions for adequate combustion and make-up air supply.

Allowances must be made for remote or constricting passageways or where dryers are located at excessive altitudes or predominantly low-pressure areas.

IMPORTANT: Make-up air must be provided from a source free of dry cleaning solvent fumes. Make-up air that is contaminated by dry cleaning solvent fumes will result in irreparable damage to the motors and other dryer components.

IMPORTANT: Make-up air openings should not be located near ductwork exhaust outlets. If make-up air openings are too close to the exhaust outlet, lint and fumes may be drawn back into the dryer area through these openings.

NOTE: Component failure due to dry cleaning solvent fumes will VOID THE WARRANTY.

10

Maytag

113203-3

Image 14
Contents MLG31PCB Installation Manual MLG31PCB For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Safety Precautions SectionStandard Specifications GASSpecifications GAS only Location of the Dryer Installation ProceduresUNPACKING/SETTING UP Maytag 113203-3 Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Maytag 113203-3 Maytag Maytag 113203-3 Maytag Maytag 113203-3 Maytag Electrical Information Electrical RequirementsElectrical Service Specifications PER Pocket GAS only GAS Information Type of GAS Typical GAS Connections Maytag Maytag 113203-3 Preparation for Operation Preoperational TestsMaytag 113203-3 Basket Tumbler Coating Shutdown Instructions Coin Mode Operating InstructionsRPM Free ModePause Mode Wrinkle Guard Accessing Coin VaultClearing CREDIT/CLEARING Cycle Parts SERVICE/PARTS InformationService Warranty Warranty InformationReturning Warranty Cards Suggested Cleaning Schedule Routine MaintenanceCleaning Adjustments LubricationData Label Information Procedure for Functional Check Replacement Components Keyboard Touch PAD LayoutMaytag 113203-3 Optional Gas Piping Kit 03/15/05-14