American Dryer Corp MLG31PCB installation manual Maytag 113203-3

Page 42

1.For Models with Johnson Direct Spark Ignition (DSI) Controller (G760)

Theory of Operation:

Start the drying cycle. When the gas burner ignites within the chosen trial for ignition time (6-seconds), the flame sensor detects gas burner flame and signals the DSI module to keep the gas valve open as long as there is a call for heat. The DSI module will “LOCK OUT” if the gas burner flame is not sensed at the end of the trial for ignition period. The trial for ignition period will be repeated for a total of three (3) retries/trials (the initial try and two [2] more retries/trials). If the flame is not sensed at the end of the third retry/trial (inter-purge period of 30-seconds) the DSI module will “LOCK OUT” (light emitting diode [L.E.D.] diagnostic indicator flashes).

A steady L.E.D. indicator indicates normal operation.

No L.E.D. indicator indicates a power or an internal failure has occurred.

2.For Models with Fenwal Controls DSI Module (128937)

Theory of Operation:

Start the drying cycle. When the gas burner ignites within the chosen trial for ignition time (8-seconds), the flame sensor detects gas burner flame and signals the DSI module to keep the gas valve open as long as there is a call for heat. The DSI module will “LOCK OUT” if the gas burner flame is not sensed at the end of the trial for ignition period. The trial for ignition period will be repeated for a total of three (3) retries/trials (the initial try and two [2] more retries/trials). If the flame is not sensed at the end of the third retry/trial (inter-purge period of 30-seconds), the DSI module will “LOCK OUT” (a red L.E.D. diagnostic indicator will flash).

An unlit red L.E.D. diagnostic indicator indicates normal operation.

A lit green L.E.D. diagnostic indicator indicates dryer controller is calling for heat and that ALL interlocks have been satisfied.

38

Maytag

113203-3

Image 42
Contents MLG31PCB Installation Manual MLG31PCB For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Safety Precautions SectionStandard Specifications GASSpecifications GAS only Installation Procedures UNPACKING/SETTING UPLocation of the Dryer Maytag 113203-3 Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Maytag 113203-3 Maytag Maytag 113203-3 Maytag Maytag 113203-3 Maytag Electrical Information Electrical RequirementsElectrical Service Specifications PER Pocket GAS only GAS Information Type of GAS Typical GAS Connections Maytag Maytag 113203-3 Preparation for Operation Preoperational TestsMaytag 113203-3 Basket Tumbler Coating Shutdown Instructions Coin Mode Operating InstructionsFree Mode Pause ModeRPM Accessing Coin Vault Clearing CREDIT/CLEARING CycleWrinkle Guard SERVICE/PARTS Information ServiceParts Warranty Information Returning Warranty CardsWarranty Routine Maintenance CleaningSuggested Cleaning Schedule Adjustments LubricationData Label Information Procedure for Functional Check Replacement Components Keyboard Touch PAD LayoutMaytag 113203-3 Optional Gas Piping Kit 03/15/05-14