C. DRYER ENCLOSURE REQUIREMENTS

Bulkheads and partitions should be made of noncombustible materials and must be located a minimum of twelve (12) inches (18-inches or more is recommended for ease of installation, maintenance , and service) above the dryer outer top, except along the front of the dryer which may be partially closed in if desired. The clearance between the bulkhead header and the dryer must be a minimum of four (4) inches and must not extend more than four (4) inches to the rear of the front. The bulkhead facing must not be closed in all the way to the top of the dryer. A one (1) inch clearance is required.

NOTE: Allowances must be made for opening the control door.

Dryers may be positioned side wall to side wall. However, a 1/16" minimum allowance must be made for opening and closing of the control door and the lint door. It is suggested that the dryer be positioned about two

(2)feet away from the nearest obstruction for ease of installation, maintenance, and service (to be measured from the back guard.) (Refer to the illustration above for details.)

NOTE: Air considerations are important for proper and efficient operation.

IMPORTANT: Even though a minimum of only 12-inches is required, 18-inches or more is suggested. The additional clearance is advantageous for ease of installation and service.

IMPORTANT: When fire sprinkler systems are located above the dryers, a minimum of 18-inches above the dryer console (module) is required. Dryers may be positioned side wall to side wall however, a 1/16-inch minimum allowance is required between dryers (or wall) for ease of installation and maintenance. Allowances must be made for the opening and closings of the control door and the lint door.

12

Image 16
Contents ML-75HS Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Section Important InformationSafety Precautions Damage plastics or rubber and also may be a fire hazardFrom the Machine to Allow Access for Cleaning SPECIFICATIONS/COMPONENT Identification SpecificationsSpecifications Component Identification Dryer Front View Dryer Rear View Installation Procedures Location RequirementsUNPACKING/SETTING UP Before Starting the DryerDryer Enclosure Requirements Fresh AIR Supply Exhaust Requirements Horizontal VentingReduced Anywhere Down Stream of the Dryer Page Page Page Electrical Information Electrical RequirementsMLG-75 Gas MLS-75 Steam MLE-75 Electric Electric Models OnlyGrounding Single-Phase 1Ø Electrical Connections Leads Page Phase Wiring Connections/Hookup Reversing Models Only Electrically Heated Models only GAS Information Gas SupplyGas Connections Inch N.P.TInch N.P.T. minimum 200,000 Natural GasPiping/Connections Steam Information Installation Instructions Steam Requirements High PressurePage Compressed Air Supply Air Pressure Steam Damper System Operation Steam Damper Air Piston Flow Control Operation Adjustment Preparation for OPERATION/START-UP Preoperational Tests Gas DryersElectrically Heated Dryers Preoperational Instructions Shut Down Instructions Service SERVICE/PARTS InformationParts Returning Warranty Cards Warranty InformationReturning Warranty Parts Page Cleaning Routine MaintenanceOperational running hours per day Adjustments DaysProcedure for Functional Check Replacement Components Microprocessor computer BoardPage Page Reversing Timer SPIN/DWELL Adjustments Timing LegendTechnical Information Data LabelSerial Number ADC113001