American Dryer Corp ML-75HS Phase Wiring Connections/Hookup Reversing Models Only

Page 29

3) 3-Phase Wiring Connections/Hookup "Reversing Models Only"

The electrical connections on ALL 3-phase (3 Ø) gas and steam dryers are made into the rear service box located at the upper left area of the dryer. Electrical connections for electrically heated dryers are made in the electric oven area located at the upper rear area of the dryer.

IMPORTANT: A separate circuit serving each dryer must be provided.

If local codes permit, power to a gas or steam dryer can be made by the use of flexible U.L. listed power cord/ pigtail (wire size must conform to rating of dryer), or the dryer can be hard wired directly to the service breaker panel. In all cases, a strain relief must be installed where the wiring enters the dryer.

The only electrical input connections to the dryer are the 3-phase (3Ø) power leads (L1,L2,L3 and sometimes neutral) and ground. Single phase (1Ø) power for the control circuit is done internally

to the dryer. No single phase input connection is required on a three phase (3Ø) dryer.

For gas and steam dryers manufactured for operation at three phase (3Ø), the electrical connections are made at the power distribution block located in the service box at the rear, upper left corner of the dryer. The ground connection is made to the copper lug also provided in this box. To gain access to the service box contactor, the service box cover must be removed.

25

Image 29
Contents ML-75HS Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Important Information SectionDamage plastics or rubber and also may be a fire hazard Safety PrecautionsFrom the Machine to Allow Access for Cleaning Specifications SPECIFICATIONS/COMPONENT IdentificationSpecifications Dryer Front View Component IdentificationDryer Rear View Location Requirements Installation ProceduresBefore Starting the Dryer UNPACKING/SETTING UPDryer Enclosure Requirements Fresh AIR Supply Horizontal Venting Exhaust RequirementsReduced Anywhere Down Stream of the Dryer Page Page Page Electrical Requirements Electrical InformationMLG-75 Gas MLS-75 Steam Electric Models Only MLE-75 ElectricGrounding Single-Phase 1Ø Electrical Connections Leads Page Phase Wiring Connections/Hookup Reversing Models Only Electrically Heated Models only Gas Supply GAS InformationInch N.P.T Gas ConnectionsInch N.P.T. minimum 200,000 Natural GasPiping/Connections Steam Information Steam Requirements High Pressure Installation InstructionsPage Compressed Air Supply Air Pressure Steam Damper System Operation Steam Damper Air Piston Flow Control Operation Adjustment Preparation for OPERATION/START-UP Gas Dryers Preoperational TestsElectrically Heated Dryers Preoperational Instructions Shut Down Instructions Parts SERVICE/PARTS InformationService Returning Warranty Parts Warranty InformationReturning Warranty Cards Page Operational running hours per day Routine MaintenanceCleaning Days AdjustmentsMicroprocessor computer Board Procedure for Functional Check Replacement ComponentsPage Page Timing Legend Reversing Timer SPIN/DWELL AdjustmentsData Label Technical InformationSerial Number ADC113001