American Dryer Corp ML-75HS installation manual

Page 52

d.Open main door. The dryer must stop and ALL output indicator lights on the back side of the micro- processor (computer) board must go out. (Refer to the illustration on previous page [page 46].)

e. Try to restart the dryer with the main door open.

f.The microprocessor (computer) board's L.E.D. display must read "DOOR." g. Close the main door and restart the dryer.

h.Functional check of microprocessor (computer) board is complete.

2.Hot Surface Ignition (HSI) System a. Upon completing installation of the

replacement Hot Surface Ignition (HSI) module, reestablish power to the dryer.

b. The HSI module's "red" indicator light will light up for approximately 5 seconds (self check routine).

If the HSI module's "red" indicator light stays on or flashes continuously, then the HSI module is wired incorrectly or has failed.

c.Start the drying cycle.

d.The hot surface ignitor will turn on. After approximately 4 seconds the glo-bar will shut off and the gas valve will be energized. The flame should now be established.

e.With the burner flame on, remove the flame sensor wire from the S2 terminal of the HSI module. The burner flame must shut off immediately.

f.Stop the drying cycle, with the flame sensor wire still removed, restart the drying cycle.

g.The hot surface ignitor will turn on and after approximately 4 seconds the hot surface ignitor will shut off. The gas valve will be energized and a burner flame should be evident for approximately 7 seconds and then shut off.

h.The HSI module will attempt two (2) additional ignition trials after which the HSI module will lock out and the "red" indicator light will flash continuously.

i.Functional check of the Hot Surface Ignition (HSI) Module is complete.

1)Replace the flame sensor wire from the S2 terminal to the HSI module.

48

Image 52
Contents ML-75HS Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Section Important InformationSafety Precautions Damage plastics or rubber and also may be a fire hazardFrom the Machine to Allow Access for Cleaning SPECIFICATIONS/COMPONENT Identification SpecificationsSpecifications Component Identification Dryer Front ViewDryer Rear View Installation Procedures Location RequirementsUNPACKING/SETTING UP Before Starting the DryerDryer Enclosure Requirements Fresh AIR Supply Exhaust Requirements Horizontal VentingReduced Anywhere Down Stream of the Dryer Page Page Page Electrical Information Electrical RequirementsMLG-75 Gas MLS-75 Steam MLE-75 Electric Electric Models OnlyGrounding Single-Phase 1Ø Electrical Connections Leads Page Phase Wiring Connections/Hookup Reversing Models Only Electrically Heated Models only GAS Information Gas SupplyGas Connections Inch N.P.TInch N.P.T. minimum 200,000 Natural GasPiping/Connections Steam Information Installation Instructions Steam Requirements High PressurePage Compressed Air Supply Air Pressure Steam Damper System Operation Steam Damper Air Piston Flow Control Operation Adjustment Preparation for OPERATION/START-UP Preoperational Tests Gas DryersElectrically Heated Dryers Preoperational Instructions Shut Down Instructions Service SERVICE/PARTS InformationParts Returning Warranty Cards Warranty InformationReturning Warranty Parts Page Cleaning Routine MaintenanceOperational running hours per day Adjustments DaysProcedure for Functional Check Replacement Components Microprocessor computer BoardPage Page Reversing Timer SPIN/DWELL Adjustments Timing LegendTechnical Information Data LabelSerial Number ADC113001