J. PREOPERATIONAL TESTS

ALL dryers are thoroughly tested and inspected before leaving the factory. However, a preoperational test should be performed before the dryer is publicly used. It is possible that adjustments have changed in transit or due to marginal location (installation) conditions.

1.Turn on electric power to the dryer.

a. Open ALL shut-off valves (Gas Models Only)

2.Refer to the Operating Instructions for starting your particular model dryer.

3.Gas Dryers

a.When a gas dryer is first started (during initial start-up), it has a tendency not to ignite on the first ignition attempt. This is because the gas supply piping is filled with air, so it may take a few minutes for the air to be purged from the lines.

NOTE: During the purging period, check to be sure that ALL gas shut-off valves are open.

NOTE: Gas dryers are equipped with a Hot Surface Ignition (HSI) system which has internal diagnostics. If ignition is not established within three times, the heat circuit in the HSI module will lock out until it is manually reset. To reset the HSI system, open and close the main door and restart the dryer.

b. A gas pressure test should be taken at the gas valve pressure tap of each dryer to assure that the water column pressure is correct and consistent.

NOTE: Water column pressure requirements (measured at the pressure tap of the gas valve body):

Natural Gas

3.5 - 4.0 Inches Water Column

L.P. Gas

10.5-11.0 Inches Water Column

IMPORTANT: There is no regulator provided in an L.P. dryer. The water column pressure must be regulated at the source (L.P. tank), or an external regulator must be added to each dryer.

Steam Dryers

a.Check to insure that steam damper is functioning properly.

1.The steam damper should not "slam" (open or closed) when it reaches the end of (piston) travel. Additionally, the steam damper should not bind and/or stop during travel. If either of these conditions occur, the flow control must be adjusted. Refer to the bottom illustration on page 34 for air adjustment instructions.

37

Image 41
Contents ML-75HS Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Important Information SectionDamage plastics or rubber and also may be a fire hazard Safety PrecautionsFrom the Machine to Allow Access for Cleaning Specifications SPECIFICATIONS/COMPONENT IdentificationSpecifications Dryer Front View Component IdentificationDryer Rear View Location Requirements Installation ProceduresBefore Starting the Dryer UNPACKING/SETTING UPDryer Enclosure Requirements Fresh AIR Supply Horizontal Venting Exhaust RequirementsReduced Anywhere Down Stream of the Dryer Page Page Page Electrical Requirements Electrical InformationMLG-75 Gas MLS-75 Steam Electric Models Only MLE-75 ElectricGrounding Single-Phase 1Ø Electrical Connections Leads Page Phase Wiring Connections/Hookup Reversing Models Only Electrically Heated Models only Gas Supply GAS InformationInch N.P.T Gas ConnectionsInch N.P.T. minimum 200,000 Natural GasPiping/Connections Steam Information Steam Requirements High Pressure Installation InstructionsPage Compressed Air Supply Air Pressure Steam Damper System Operation Steam Damper Air Piston Flow Control Operation Adjustment Preparation for OPERATION/START-UP Gas Dryers Preoperational TestsElectrically Heated Dryers Preoperational Instructions Shut Down Instructions Parts SERVICE/PARTS InformationService Returning Warranty Parts Warranty InformationReturning Warranty Cards Page Operational running hours per day Routine MaintenanceCleaning Days AdjustmentsMicroprocessor computer Board Procedure for Functional Check Replacement ComponentsPage Page Timing Legend Reversing Timer SPIN/DWELL AdjustmentsData Label Technical InformationSerial Number ADC113001