American Dryer Corp AD-120ES II installation manual

Page 21

ALL ductwork should be smooth inside with no projections from sheet metal screws or other obstructions, which will collect lint. When adding ducts, the ducts to be added should overlap the duct to which it is connected. ALL ductwork joints must be taped to prevent moisture and lint from escaping into the building. Additionally, inspection doors should be installed at strategic points in the exhaust ductwork for periodic inspection and cleaning of lint from the ductwork.

To protect the outside end of the horizontal ductwork from the weather, a 90° elbow bent downward should be installed where the exhaust exits the building. If the ductwork travels vertically up through the roof, it should be protected from the weather by using a 180° turn to point the opening downward. In either case, allow at least twice the diameter of the duct between the duct opening and the nearest obstruction (i.e., roof or ground level).

IMPORTANT: Exhaust back pressure measured by a manometer at the dryer exhaust duct area must be no less than 0 and must not exceed 0.3 inches (0.74 mb) of water column (W.C.).

NOTE: When the exhaust ductwork passes through a wall, ceiling, or roof made of combustible materials, the opening must be 2-inches (5.08 cm) larger than the duct (all the way around). The duct must be centered within this opening.

a.Outside Ductwork Protection

1)To protect the outside end of the horizontal ductwork from the weather, a 90° elbow bent downward should be installed where the exhaust exits the building. If the exhaust ductwork travels vertically up through the roof, it should be protected from the weather by using a 180° turn to point the opening downward. In either case, allow at least twice the diameter of the duct between the duct opening and the nearest obstruction.

IMPORTANT: DO NOT use screens, louvers, or caps on the outside opening of the exhaust ductwork.

17

Image 21
Contents AD-120ES Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Data Label Cleaning Adjustments LubricationReceiving and Handling Important InformationWhat to do if YOU Smell GAS Safety PrecautionsStandards Specifications SPECIFICATIONS/COMPONENT IdentificationADG-120ES ADE-120ES ADS-120ES Component Identification Page Location Requirements Installation ProceduresUNPACKING/SETTING UP Page This Exhaust Duct Transition Piece Must be Installed First Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Downstream of Dryer Page Page Page Electrical Information Electrical Service Specifications PER Dryer ADE-120 II 72 Kw Electric Reversing, 3ø ADE-120 II 80 Kw Electric Reversing, 3ø Page Page GAS Information Type of GAS Page Page 862.84 kPa Steam Information689.47 kPa 204 kg/hrPage Bars Page Preparation for Operation Preoperational Tests Inches 26.1 mb water column Basket Coating Shut Down InstructionsOperating Instructions SERVICE/PARTS Information ServiceParts Returning Warranty Cards Warranty InformationWarranty Returning Warranty PartsPage Routine Maintenance CleaningSuggested Cleaning Schedule Steam Dryers Lubrication AdjustmentsDrive motor is not operating does not start TroubleshootingBlower motor is not operating does not start Microprocessor controller computer display reads door Microprocessor controller computer display reads dSFLFailed 24 VAC transformer No heat for Electric Models only No heat for Steam Models onlyCondensation on main door glass Dryer operates but is taking too long to dryExcessive noise and/or vibration Dryer is making scraping noise at basket tumbler areaGAS Models Drive motor only is not operating does not startElectric Models Failed hi-limit thermostat for GAS and Electric Models only Dryer operates but is taking too long to dry loadCondensation on main door glass Data Label Data Label InformationSerial Number Timing Legend Reversing Timer SPIN/DWELL AdjustmentsProcedure for Functional Check Replacement Components Page Page P O R T a N T ADC P/N114501 ADC 02/07/01-25 02/12/01-25 04/06/01-25 06/27/01-25