Chapter 4: Installation
4-1 Mounting the RPV
The RPV can be mounted to a machine, on the floor, or on a wall. The optional floor stand provides installation location flexibility. The RPV can be used with more than one machine by switching hoses and positioning the floor mounted RPV in a convenient place.
Wall Mount Installation
This type of installation uses the optional wall mounting bracket to mount the Remote Proportioning Valve to a convenient wall, pipe, or other structural member. Use the following procedure to install the RPV using the
1.Select a location for the RPV that allows access to the
2.Secure the wall bracket to a suitable wall, beam, etc. that can support 250 lbs. of weight hanging from it.
3.Prepare the RPV for installation by removing the four bolts that attach the single outlet tube to the valve body.
Note: The outlet tube is embedded in silicone sealant and should stick to the valve body during installation. Do not pull them apart. If the seal between the outlet tube and the valve body fails, apply a new bead of silicone sealant before mounting the RPV.
4.Insert the RPV outlet tube through the hole in the bracket and secure it with the longer
5.Connect the RPV material outlet tube to the vacuum receiver using flex hose and hose clamps.
6.Connect the two material inlet tubes to the pickup wands with flex hose and hose clamps.
Remote Proportioning Valve | Chapter 4: Installation | 12 of 30 |