Sterling 882.00268.00 specifications Knob Box Assembly

Page 18

Figure 4: Knob Box Assembly

Remote Proportioning Valve

Chapter 4: Installation

17 of 30

Image 18
Contents SPV Remote Proportioning Valve Parts and Service Department Shipping Info Table of Contents Troubleshooting Safety How to Use This ManualSafety Symbols Used in this Manual Remote Proportioning Valve Safety Safety General Safety Information Wear Safety Glasses and Work GlovesPage General Description Functional DescriptionModels Covered in This Manual How it WorksTypical Features and Components RPV- B and DInstallation Wall Mount InstallationMounting the RPV Wall-Mount Configuration Floor-Mount Installation Floor-Mount ConfigurationMachine-Mount Installation Installing the RPV Controls Installing the RPV-A Autoload Knob Box ControlKnob Box Assembly RPV-B or RPV-D Standalone Connection Diagram Standalone Junction Box Assembly Installing the RPV-C 9953 and 9963 Hopper Loader Control RPV-C to 9953 or 9963 Connection DiagramKnob Box Operation Power Switch and IndicatorOperation Ratio KnobStandalone Control Operation Hopper Loader Conversion Operation ExampleWeight Test for Accurate Proportioning Troubleshooting IntroductionProblem Possible cause Solution Appendix Customer Satisfaction Warranty ProgramTechnical Specifications Electrical RequirementsDrawings and Diagrams RPV DimensionsRPV Assembly Drawing and Parts Breakdown Parts Department Service DepartmentTechnical Assistance Sales Department