Sterling 882.00268.00 Installing the RPV Controls, Installing the RPV-A Autoload Knob Box Control

Page 17

4-2 Installing the RPV Controls

DANGER! Disconnect and lock out power before working on equipment. Do not reconnect electric power until the installation is complete, the work has been checked, and all tools are removed, and all safety devices are activated. All electrical work must conform to all codes in effect at the installation site.

Installing the RPV-A Autoload Knob Box Control

If your RPV has the RPV-A control package, use the following procedure to install it:

1.Disconnect and lock out power to the Autoloader Hopper Loader.

2.Wire the RPV Material A and B solenoids to the Autoloader Hopper Loader control box using 16AWG wire. See Figure 3.

3.Remove Jumper W3 installed between Terminals 13 and 14 on Terminal Block TB1 in the Autoloader Hopper Loader control box.

Note: The knob box control will not function properly unless you remove this jumper.

4.Toggle the power switch on the Autoload Hopper Loader to the ON position. This switch must be ON to use the Knob Box Control as a remote ON/OFF switch.

5.Plug the white logic plug connected to the RPV knob box into the receptacle marked J2 on the left side of the Autoloader control enclosure. See Figure 4 on page 17.

6.Re-connect power.

Figure 3: RPV-A to Autoloader Wiring Diagram

Remote Proportioning Valve

Chapter 4: Installation

16 of 30

Image 17
Contents SPV Remote Proportioning Valve Parts and Service Department Shipping Info Table of Contents Troubleshooting Safety Symbols Used in this Manual SafetyHow to Use This Manual Remote Proportioning Valve Safety Safety Wear Safety Glasses and Work Gloves General Safety InformationPage Models Covered in This Manual Functional DescriptionGeneral Description How it WorksRPV- B and D Typical Features and ComponentsMounting the RPV InstallationWall Mount Installation Wall-Mount Configuration Floor-Mount Configuration Floor-Mount InstallationMachine-Mount Installation Installing the RPV-A Autoload Knob Box Control Installing the RPV ControlsKnob Box Assembly RPV-B or RPV-D Standalone Connection Diagram Standalone Junction Box Assembly RPV-C to 9953 or 9963 Connection Diagram Installing the RPV-C 9953 and 9963 Hopper Loader ControlOperation Power Switch and IndicatorKnob Box Operation Ratio KnobStandalone Control Operation Example Hopper Loader Conversion OperationWeight Test for Accurate Proportioning Introduction TroubleshootingProblem Possible cause Solution Technical Specifications Customer Satisfaction Warranty ProgramAppendix Electrical RequirementsRPV Dimensions Drawings and DiagramsRPV Assembly Drawing and Parts Breakdown Technical Assistance Service DepartmentParts Department Sales Department