Sterling 882.00268.00 specifications Weight Test for Accurate Proportioning

Page 25

5-4 Weight Test for Accurate Proportioning

To get an accurate proportion of regrind and virgin materials, run the test described below to determine the conveying rate of your particular installation using your materials. The test will determine the ratio settings needed to deliver the desired mix.

1.Determine the total throughput of the machine. This is equal to the amount (pounds) of material your processing machine uses in an hour.

2.Weigh out a known quantity of regrind into the container from which the regrind is conveyed. This amount should be enough to service the processing machine for the duration of the test.

3.This test should be run for at least fifteen minutes.

4.Set the Remote Proportioning Valve controls to approximate the desired proportions of virgin and regrind.

5.Note the time and begin processing.

6.Stop processing after at least twenty minutes. Note the total processing time.

7.Weigh the regrind remaining in the container.

8.Determine the amount of regrind that would have been used if the test had been run for an hour (Lbs. Regrind/Hour). For example, if you tested for fifteen minutes, multiply by four.

9.Divide the (Lbs. Regrind/Hour) by the (Lbs./hour) throughput figure to determine the percentage of regrind at the current setting.

10.If the percentage is not acceptable, re-adjust the controls and repeat steps 2 through 9 until the proportions are correct.

Remote Proportioning Valve

Chapter 5: Operation

24 of 30

Image 25
Contents SPV Remote Proportioning Valve Parts and Service Department Shipping Info Table of Contents Troubleshooting How to Use This Manual SafetySafety Symbols Used in this Manual Remote Proportioning Valve Safety Safety Wear Safety Glasses and Work Gloves General Safety InformationPage Models Covered in This Manual Functional DescriptionGeneral Description How it WorksRPV- B and D Typical Features and ComponentsWall Mount Installation InstallationMounting the RPV Wall-Mount Configuration Floor-Mount Configuration Floor-Mount InstallationMachine-Mount Installation Installing the RPV-A Autoload Knob Box Control Installing the RPV ControlsKnob Box Assembly RPV-B or RPV-D Standalone Connection Diagram Standalone Junction Box Assembly RPV-C to 9953 or 9963 Connection Diagram Installing the RPV-C 9953 and 9963 Hopper Loader ControlOperation Power Switch and IndicatorKnob Box Operation Ratio KnobStandalone Control Operation Example Hopper Loader Conversion OperationWeight Test for Accurate Proportioning Introduction TroubleshootingProblem Possible cause Solution Technical Specifications Customer Satisfaction Warranty ProgramAppendix Electrical RequirementsRPV Dimensions Drawings and DiagramsRPV Assembly Drawing and Parts Breakdown Technical Assistance Service DepartmentParts Department Sales Department