Sterling 882.00268.00 specifications RPV-B or RPV-D Standalone Connection Diagram

Page 19

Installing the RPV-B and RPV-D Standalone for Central Vacuum Systems

This control configuration is used to convert a central system vacuum hopper into a proportioning vacuum hopper.

The stand-alone control can be used in systems with 24 VDC or 110 VAC T-valve solenoids.

The RPV-B requires an external 110/60/1 VAC power supply. The RPV-D requires a 220/50- 60/1 power supply and the proper plug and power cable (supplied by customer). The power supply can be provided through a grounded duplex plug or the control can be connected to a power main (where codes permit).

If your RPV has the RPV-B or RPV-D control package, use the following procedure to install it: (See Figure 5 for more information.)

1.Remove the cover from the Standalone control enclosure. Turn it over to gain access to the eight-pin socket at the base of the timer. (See Figure 6 on page 19.)

2.Using #14AWG leads, wire terminals three (3) and six (6) to Solenoid 1, material A, located in the RPV. Splice the leads together within the RPV shroud.

3.Using #14AWG leads, wire terminals four (4) and five (5) to solenoid 2, material B, located within the RPV. Splice the leads together within the RPV shroud.

4.Using #14AWG leads, wire terminals one (1) and eight (8) to the existing sequence tee valve.

5.Replace the cover of the enclosure and tighten the screws.

Figure 5: RPV-B or RPV-D Standalone Connection Diagram

Remote Proportioning Valve

Chapter 4: Installation

18 of 30

Image 19
Contents SPV Remote Proportioning Valve Parts and Service Department Shipping Info Table of Contents Troubleshooting How to Use This Manual SafetySafety Symbols Used in this Manual Remote Proportioning Valve Safety Safety Wear Safety Glasses and Work Gloves General Safety InformationPage How it Works Functional DescriptionModels Covered in This Manual General DescriptionRPV- B and D Typical Features and ComponentsWall Mount Installation InstallationMounting the RPV Wall-Mount Configuration Floor-Mount Configuration Floor-Mount InstallationMachine-Mount Installation Installing the RPV-A Autoload Knob Box Control Installing the RPV ControlsKnob Box Assembly RPV-B or RPV-D Standalone Connection Diagram Standalone Junction Box Assembly RPV-C to 9953 or 9963 Connection Diagram Installing the RPV-C 9953 and 9963 Hopper Loader ControlRatio Knob Power Switch and IndicatorOperation Knob Box OperationStandalone Control Operation Example Hopper Loader Conversion OperationWeight Test for Accurate Proportioning Introduction TroubleshootingProblem Possible cause Solution Electrical Requirements Customer Satisfaction Warranty ProgramTechnical Specifications AppendixRPV Dimensions Drawings and DiagramsRPV Assembly Drawing and Parts Breakdown Sales Department Service DepartmentTechnical Assistance Parts Department