IBM 835, 890, 870 manual Guidelines for Ordering a POD Activation Feature

Page 11

Guidelines for Ordering a POD Activation Feature

Permanent Capacity can be activated by ordering POD Activation Features in any of the following order scenarios.

Each scenario described below highlights the fact that it is now possible to order a POD Activation Feature along with new Box Orders, Upgrades, and Conversions .. this means you are no longer requ ired to send CUoD Data (VPD) along with a POD Activation Feature order to have it fulfilled.

Guidelines for Ordering Permanent Capacity

ibm.com/eserver/iseries

 

 

New Box Orders

=> The order for the new server can include new POD Activation Features, with the resulting POD Activation Code applied directly in manufacturing

Model-to-Model Upgrade ( new footprint)

=> 100% activation of all standby processors is required on the old hardware prior to ordering a conversion/upgrade. => All records of POD Activation Features ordered prior to the converion/upgrade are removed from the machine

records (upgrade/conversion pricing takes into account the fact that 100% of the standby processors were previously activated

=> The order for the upgrade can include new POD Activation Features, with the resulting POD Activation Code applied directly in manufacturing

Processor-to-Processor Conversion or Model-to-Model Upgrade (no new footprint)

=> 100% activation of all standby processors is required on the old hardware prior to ordering a conversion/upgrade. => All records of POD Activation Features ordered prior to the converion/upgrade

are removed from the machine records (upgrade/conversion pricing takes into account the fact that 100% of the standby processors were previously activated

=> The order for the conversion/upgrade can include new POD Activation Features, with the resulting POD Activation Code mailed/posted without requiring CUoD Data (VPD) to be collected from the server and sent to IBM

Package-to-Package Conversion

=> All records of POD Activation Features ordered prior to the conversion remain on the machine records

=> The order for the conversion can include new POD Activation Features, with a resulting POD Activation Code that accounts for both old and new POD Activation Features being mailed/posted without requiring CUoD Data (VPD) to be collected from the server and sent to IBM

Activation Feature Orders

=> For orders that have POD Activation Features but don't contain a Processor or Package Feature .. if the Machine Serial# and/or the Capacity Card Serial# have not been altered outside of the IBM manufacturing or field maintenance process, then a POD Activation Code will be generated and mailed/posted without requiring CUoD Data (VPD) to be collected from the server and sent to IBM

8 2002 IBM Corporation

IBM & IBM Business Partner Internal Use Until Announced

11

12/15/2003

Image 11
Contents Important Important Important 12/15/2003 Preface Purpose of Planning Guide Planning Guide Feedback Where to Get HelpPlanning Ahead ISeries Capacity PlanningWhat’s new Capacity Upgrade on Demand CUoDProcessor Utilization CUoD and On/Off CoDCUoD aka. permanent capacity on demand Ordering permanent capacityTrial Capacity is not offered on new models Permanent Capacity PricingGuidelines for Ordering Permanent Capacity Guidelines for Ordering a POD Activation FeatureStep-by-Step Instructions Ordering Permanent CapacityFax Number 12/15/2003 Important Considerations Converting Hardware Features Converting FeaturesCancellation of Orders Processor Failures Results of Moving iSeries Hardware Moving HardwareOltp Capacity Logical PartitionsAssign Processors 12/15/2003 SW Licenses CPU Utilization Performance ConsiderationsPM/400 Management Central ToolsWorkload Estimator License License, Warranty, MaintenanceWarranty MaintenanceCE Maintenance Instructions Model 825, 870, 890 with V5R2 Maintenance InstructionsCE Conversion Instructions Install new Hardware and IPLWait 5 Minutes Yes CE Upgrade Instructions
Related manuals
Manual 94 pages 54.16 Kb