IBM 835, 890, 870 manual 12/15/2003

Page 14

Step4: Customer retrieves the POD Activation Code from the web or waits for the POD Activation Code

to be sent by mail. The POD Activation Code will be posted on the web usually within one business day of receiving the order on the manufacturing floor. To retrieve the POD Activation Code follow these steps:

1) Go to the following Web-site:

http: //www.ibm.com/servers/eserver/iseries/ondemand/cod

2)Enter the Machine Type and Serial number of the target server on the web page

3)Print and/or record the POD Activation Code displayed on the web page

Step5: Customer enters the POD Activation Code at the System Console for the target server:

Note: Prior to entering the new code, stop any currently active requests for temporary capacity (On/Off CoD)

1)Start System Service Tools (SST) with the STRSST command or start

Dedicated Service Tools (DST) with Function 21 on the control panel (key in manual position)

2)Sign on using service tools user profile of System capacity - administration

3)Select the option to WORK WITH SYSTEM CAPACITY

4)Enter POD Activation Code and press Enter

5)Press Enter to confirm change and exit the System Capacity service function

Step6: Customer assigns the Activated Processors to a partition ... you must do these steps even if your machine is not configured for LPAR!

A)Start the Work with system partitions option in DST or SST

B)Enter Option 3 (Work with partition configuration)

C)Enter Option 2 (Change partition processing resources) next to the PRIMARY

D)Enter a value for "New number of processors" (The value should represent TOTAL active processors) ... press Enter

Note: If a configuration error is signaled at the bottom of the screen, refer to LPAR trouble shooting article at http://publib.boulder.ibm.com/iseries/v5r2/ic2924/info/rzaj8/rzaj8overview.htm

E)Press Enter to confirm the change

F)Exit SST or DST

14

12/15/2003

Image 14
Contents Important Important Important 12/15/2003 Preface Purpose of Planning Guide Where to Get Help Planning Guide FeedbackISeries Capacity Planning Planning AheadCapacity Upgrade on Demand CUoD What’s newCUoD and On/Off CoD Processor UtilizationOrdering permanent capacity CUoD aka. permanent capacity on demandPermanent Capacity Pricing Trial Capacity is not offered on new modelsGuidelines for Ordering a POD Activation Feature Guidelines for Ordering Permanent CapacityOrdering Permanent Capacity Step-by-Step InstructionsFax Number 12/15/2003 Important Considerations Converting Features Converting Hardware FeaturesCancellation of Orders Processor Failures Moving Hardware Results of Moving iSeries HardwareOltp Capacity Logical PartitionsAssign Processors 12/15/2003 SW Licenses Performance Considerations CPU UtilizationPM/400 Management Central ToolsWorkload Estimator Maintenance License, Warranty, MaintenanceWarranty LicenseModel 825, 870, 890 with V5R2 Maintenance Instructions CE Maintenance InstructionsInstall new Hardware and IPL CE Conversion InstructionsCE Upgrade Instructions Wait 5 Minutes Yes
Related manuals
Manual 94 pages 54.16 Kb