Furuno FAR-2167DS-D, FAR-2167DS-BB installation manual Wiring Overview

Page 25

2. WIRING

2.1 Wiring Overview

ANTENNA UNIT

POWER SUPPLY UNIT

TPYCY-1.5

TPYCY-2.5

TB801

TB802

MONITOR UNIT

 

 

 

 

 

 

 

 

 

 

 

200 VAC, 3φ, 50 Hz

 

 

 

220 VAC, 3φ, 60 Hz

 

 

2.5-

 

 

 

 

 

 

380 VAC, 3φ, 50 Hz

 

 

440 VAC, 3φ, 60 Hz

 

 

TPYC

 

 

 

 

110 VAC, 3φ,

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

RU-5693

 

 

 

 

 

 

60 Hz

 

 

 

 

 

 

 

 

 

-1.5

 

 

 

 

 

 

 

 

 

220 VAC, 3φ,

 

 

 

 

 

 

 

RU-6522

 

 

 

 

50 Hz

 

 

 

 

 

 

 

 

 

TPYC

 

 

 

 

 

 

 

 

 

 

440 VAC, 3φ,

RU-5466-1

 

 

 

 

 

50 Hz

 

 

 

 

 

 

 

 

 

-2.5

 

 

 

 

 

 

 

 

 

100-115 VAC/220-230V,

 

 

 

 

 

 

 

 

DPYC

 

 

 

 

1φ, 50/60 Hz

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

440 VAC,

 

 

 

 

 

 

 

 

 

RU-1803

 

 

 

 

 

 

 

1φ, 50/60 Hz

 

 

 

 

 

 

 

 

 

 

 

 

 

 

: Fabrication required

RW-9600

5/10m

CONTROL UNIT

PROCESSOR UNIT

SINGLELINKD/D-

15/30/40/50 m

 

 

 

(Max.100 m)

 

 

 

 

 

DPYC-2.5

 

 

DVI

(RCU-014 or RCU-015)

 

 

MEMORY CARD

 

 

 

INTERFACE

 

 

 

CU-200-FAR

 

 

 

 

100-230 VAC

XH10P-W-5P

 

 

L=10/20/30 m

 

 

1φ, 50/60 Hz

 

 

 

XH10P-W-6P L=1.5/10/20/30m

CONTROL UNIT

DPYC-2.5

 

 

 

 

 

(RCU-016)

100-115V/220-230 VAC

 

 

F1

1φ, 50/60Hz

 

 

F2

 

 

F3

 

 

 

F4

* : Junction box required if length exceeds 100 m (max. 300 m)

2-1

Image 25
Contents Installation manual 00014869014 Safety Instructions Use only the specified power cables Iii System ConfigurationName Type Code No Qty Remarks Standard supplyName Type Code No Remarks Optional equipmentThis page is intentionally left blank Mounting considerations Antenna UnitSiting MountingMounting precaution for S-band antenna unit Installation precaution for S-band antenna unitAssembling the antenna unit Assembling the antenna unitAttachment of lifting fixtures, collar and ropes How to hoist the antenna unitFastening the antenna unit to the mounting platform Installation of reinforcement ribsMounting the antenna unit Monitor Unit Mounting procedureFlush mounting Desktop mounting Contents of desktop mounting kit FP03-09820Attaching hand grips Fixing with KB keyboard fixing plate Control UnitMounting dimensions for control unit RCU-015/RCU-016 Mounting dimensions for control unit RCU-014Fixing without KB fixing plate Name Type Qty Contents of flush mount kit for RCU-014/015/016Control unit RCU-014, inside view Connecting RCU-016 in series with RCU-014Changing cable entrance on control unit RCU-015/RCU-016 Changing the cable entrance on control unit RCU-015/RCU-016Processor Unit Mounting dimensions for processor unitMounting dimensions for power supply unit Power Supply UnitWiring Overview WiringFabricating signal cable RW-9600 Fabricating signal cable RW-9600 and HV cable TYPCY-1.5Antenna unit, front view Armor Gasket Signal cable Flat washer Flat washer Gland nut How to fabricate HV cable TYPCY-1.5 How to wire Wago connectorHow to fabricate power cable TYPCY-2.5 Fabricating the power cable TYPCY-2.5Antenna unit, left-side view Passing flat washer, etc. onto HV cableFabricating power cable DPYC-2.5 Fabricating the power cable DPYC-2.5Monitor Unit for FAR-2167DS Monitor unit MU-201CR, rear viewProcessor Unit Processor unit, rear view Connection of cablesCable XH10P-W-6P L=20/30M Location of connectors inside the processor unit Location of connectorsPower cable TPYC-1.5 Signal cable RW-9600 Between antenna unit and processor unitPort Conventional remote display FAR-2167DS Connection of Sub-displayFabricating cable connected to terminal TB1, TB2, TB3 Power supply unit, inside viewTerminal TB1 cable DPYC-2.5 Armor Power supply Fuse Jumper connector P108 Changing AC Power SpecificationProcessor unit Processor unit, inside viewHow to adjust the overvoltage detection circuit Power Fuse Jumper connector P8 Power supply unitHow to adjust the overvoltage detection circuit Initializing Tuning AdjustmentsHeading alignment Heading AlignmentFor Control Unit RCU-015 For Control Unit RCU-014Initialize menu Echo ADJ menuHow to access the Initialize Menu with Control Unit RCU-015 Examples of correct and incorrect sweep timings Adjusting Sweep TimingSuppressing Main Bang Echo menu setting Other SettingsBlind Sector 1 and Blind Sector Scanner menuANT SW and ANT Stopped Radar no and Radar Posn Installation menuOn Time and TX Time LENGTH/WIDTH, Scanner Posn and SUB Scanner Posn OWN Ship Info menuGPS 1 ANT Posn and GPS 2 ANT Posn ARP W/O Gyro Not shown on IMO radar Arpa Preset menuARP-related menus ANT Select EAV w/o Gyro Other menuOther menu This page intentionally left blank Gyro Converter GC-10 Installing the Gyro Converter boardFixing Gyro Converter board inside the processor unit Wiring Wago connector Connecting connector assemblies inside processor unitAttaching plastic cover for Gyro Converter board DIP switch, jumper wire settings Connection of external power supplyDefault setting Connection of external power supply to Gyro Converter boardJP1 JP1 JP2 JP3 JP4 JP5 Setting method 2 by make and model of gyrocompassGyro Converter board 64P1106HDG menu Setting the heading readout on the radar displayMemory Card Interface Unit Flush mounting dimensions for memory card interface unitDesktop mount ConnectionsOne memory card if unit and one processor unit One memory card if unit and multiple processor unitsType Code No Contents DVI-RGB Conversion Kit How to wire the DVI-RBG conversion boardProcessor unit bottom chassis Processor unit, side viewConnecting wires to the housing DVI-RGB BNC Connector ConverterInput Data Specifications Contents RemarksOutput IEC 61162 output sentence IEC 61162 input sentence and prioritySentence and order of priority SentencePacking List 1 SN30AF/SN36AF 70+6 000-157-497-10 工事材料表 000-155-826-10 PSU-006 AC100V 付属品表 03GL-X-9506 . CU-200-FAR GC-10-2 GC-10 $40# Page Page May 1707 R.Esumi Sep/2010 Y.NISHIYAMA Page Jan.1808 R.Esumi Apr.2307 R.Esumi Apr.2307 R.Esumi Apr.2307 R.Esumi Apr.2307 R.Esumi Apr.2307 R.Esumi Page Page Page Page Page Page Page Page Page Interconnection Diagram