Furuno FAR-2167DS-BB Scanner menu, Blind Sector 1 and Blind Sector, ANT SW and ANT Stopped

Page 50

SCANNER menu

1.Open the INITIALIZE menu as described on page 3-3 and 3-4.

2.Choose 3 SCANNER to open the SCANNER menu.

[SCANNER]

1BACK

2BLIND SECTOR 1 START 000° ANGLE 000°

3BLIND SECTOR 2 START 000° ANGLE 000°

4ANT REVOLUTION LO/HI/AUTO

5ANT SW

OFF/ON/EXT

6ANT STOPPED

STBY/TX

7M SPEC

OFF/ON

8BB TYPE

NORMAL/BB

SCANNER menu

BLIND SECTOR 1 and BLIND SECTOR 2

Set area (up to 2) where no radar pulses will be transmitted. Heading should be adjusted before setting any blind sector. For example, set the area where an interfering object at the rear of the antenna would produce a dead sector (area where no echoes appear) on the display. To enter an area, enter start bearing (relative to heading) and dead sector angle. To erase the area, enter 0 for both the START and ANGLE options. The setting range of START is 0 to 359 and ANGLE is 0 to 180 .

ANT REVOLUTION

No use.

ANT SW and ANT STOPPED

This is used for antenna maintenance by service personnel.

MSPEC

No use.

BB TYPE

Choose type of radar. Select "BB" for FAR-2167DS-BB.

3-8

Image 50
Contents Installation manual 00014869014 Safety Instructions Use only the specified power cables System Configuration IiiStandard supply Name Type Code No Qty RemarksOptional equipment Name Type Code No RemarksThis page is intentionally left blank Siting Antenna UnitMounting considerations MountingInstallation precaution for S-band antenna unit Mounting precaution for S-band antenna unitAssembling the antenna unit Assembling the antenna unitHow to hoist the antenna unit Attachment of lifting fixtures, collar and ropesInstallation of reinforcement ribs Fastening the antenna unit to the mounting platformMounting the antenna unit Flush mounting Mounting procedureMonitor Unit Contents of desktop mounting kit FP03-09820 Desktop mountingAttaching hand grips Control Unit Fixing with KB keyboard fixing plateFixing without KB fixing plate Mounting dimensions for control unit RCU-014Mounting dimensions for control unit RCU-015/RCU-016 Contents of flush mount kit for RCU-014/015/016 Name Type QtyConnecting RCU-016 in series with RCU-014 Control unit RCU-014, inside viewChanging the cable entrance on control unit RCU-015/RCU-016 Changing cable entrance on control unit RCU-015/RCU-016Mounting dimensions for processor unit Processor UnitPower Supply Unit Mounting dimensions for power supply unitWiring Wiring OverviewAntenna unit, front view Fabricating signal cable RW-9600 and HV cable TYPCY-1.5Fabricating signal cable RW-9600 Armor Gasket Signal cable Flat washer Flat washer Gland nut How to wire Wago connector How to fabricate HV cable TYPCY-1.5Fabricating the power cable TYPCY-2.5 How to fabricate power cable TYPCY-2.5Passing flat washer, etc. onto HV cable Antenna unit, left-side viewMonitor Unit for FAR-2167DS Fabricating the power cable DPYC-2.5Fabricating power cable DPYC-2.5 Monitor unit MU-201CR, rear viewProcessor Unit Cable XH10P-W-6P L=20/30M Connection of cablesProcessor unit, rear view Location of connectors Location of connectors inside the processor unitSignal cable RW-9600 Between antenna unit and processor unit Power cable TPYC-1.5Connection of Sub-display Port Conventional remote display FAR-2167DSTerminal TB1 cable DPYC-2.5 Power supply unit, inside viewFabricating cable connected to terminal TB1, TB2, TB3 Armor Processor unit Changing AC Power SpecificationPower supply Fuse Jumper connector P108 Processor unit, inside viewHow to adjust the overvoltage detection circuit Power supply unit Power Fuse Jumper connector P8How to adjust the overvoltage detection circuit Adjustments Initializing TuningHeading Alignment Heading alignmentInitialize menu For Control Unit RCU-014For Control Unit RCU-015 Echo ADJ menuHow to access the Initialize Menu with Control Unit RCU-015 Adjusting Sweep Timing Examples of correct and incorrect sweep timingsSuppressing Main Bang Other Settings Echo menu settingANT SW and ANT Stopped Scanner menuBlind Sector 1 and Blind Sector On Time and TX Time Installation menuRadar no and Radar Posn GPS 1 ANT Posn and GPS 2 ANT Posn OWN Ship Info menuLENGTH/WIDTH, Scanner Posn and SUB Scanner Posn ARP-related menus Arpa Preset menuARP W/O Gyro Not shown on IMO radar ANT Select Other menu Other menuEAV w/o Gyro This page intentionally left blank Installing the Gyro Converter board Gyro Converter GC-10Fixing Gyro Converter board inside the processor unit Connecting connector assemblies inside processor unit Wiring Wago connectorAttaching plastic cover for Gyro Converter board Default setting Connection of external power supplyDIP switch, jumper wire settings Connection of external power supply to Gyro Converter boardJP1 Setting method 2 by make and model of gyrocompass JP1 JP2 JP3 JP4 JP564P1106 Gyro Converter boardSetting the heading readout on the radar display HDG menuFlush mounting dimensions for memory card interface unit Memory Card Interface UnitOne memory card if unit and one processor unit ConnectionsDesktop mount One memory card if unit and multiple processor unitsType Code No Contents How to wire the DVI-RBG conversion board DVI-RGB Conversion KitProcessor unit, side view Processor unit bottom chassisConnecting wires to the housing BNC Connector Converter DVI-RGBOutput Data Specifications Contents RemarksInput Sentence and order of priority IEC 61162 input sentence and priorityIEC 61162 output sentence SentencePacking List 1 SN30AF/SN36AF 70+6 000-157-497-10 工事材料表 000-155-826-10 PSU-006 AC100V 付属品表 03GL-X-9506 . CU-200-FAR GC-10-2 GC-10 $40# Page Page May 1707 R.Esumi Sep/2010 Y.NISHIYAMA Page Jan.1808 R.Esumi Apr.2307 R.Esumi Apr.2307 R.Esumi Apr.2307 R.Esumi Apr.2307 R.Esumi Apr.2307 R.Esumi Page Page Page Page Page Page Page Page Page Interconnection Diagram