Furuno FAR-2167DS-BB, FAR-2167DS-D How to access the Initialize Menu with Control Unit RCU-015

Page 46

How to access the INITIALIZE Menu with Control Unit RCU-015

1. Use the trackball to place the pointer on the MENU box so it is highlighted. DO NOT click the menu box - just leave the pointer over "MENU".

2. Press and hold down the F1 key. Keep it held down during the next step.

3. Push the right button five times. You should hear three beeps on the fifth push.

The INITIALIZE menu appears. Choose 4 INSTALLATION to show the installation menus.

How to adjust heading of external radar from this radar

1.Put the cursor in the ANT box at the top left corner then push the right button.

2.Press the [8] key to select SUB MONITOR.

3.Push the [8] key until ON is selected then push the left button.

4.Push the right button.

5.Left-click the ANT box to select SUB MONITOR.

6.Follow the procedure on page 3-3.

3-4

Image 46
Contents Installation manual 00014869014 Safety Instructions Use only the specified power cables System Configuration IiiStandard supply Name Type Code No Qty RemarksOptional equipment Name Type Code No RemarksThis page is intentionally left blank Siting Antenna UnitMounting considerations MountingInstallation precaution for S-band antenna unit Mounting precaution for S-band antenna unitAssembling the antenna unit Assembling the antenna unitHow to hoist the antenna unit Attachment of lifting fixtures, collar and ropesInstallation of reinforcement ribs Fastening the antenna unit to the mounting platformMounting the antenna unit Monitor Unit Mounting procedureFlush mounting Contents of desktop mounting kit FP03-09820 Desktop mountingAttaching hand grips Control Unit Fixing with KB keyboard fixing plateMounting dimensions for control unit RCU-015/RCU-016 Mounting dimensions for control unit RCU-014Fixing without KB fixing plate Contents of flush mount kit for RCU-014/015/016 Name Type QtyConnecting RCU-016 in series with RCU-014 Control unit RCU-014, inside viewChanging the cable entrance on control unit RCU-015/RCU-016 Changing cable entrance on control unit RCU-015/RCU-016Mounting dimensions for processor unit Processor UnitPower Supply Unit Mounting dimensions for power supply unitWiring Wiring OverviewFabricating signal cable RW-9600 Fabricating signal cable RW-9600 and HV cable TYPCY-1.5Antenna unit, front view Armor Gasket Signal cable Flat washer Flat washer Gland nut How to wire Wago connector How to fabricate HV cable TYPCY-1.5Fabricating the power cable TYPCY-2.5 How to fabricate power cable TYPCY-2.5Passing flat washer, etc. onto HV cable Antenna unit, left-side viewMonitor Unit for FAR-2167DS Fabricating the power cable DPYC-2.5Fabricating power cable DPYC-2.5 Monitor unit MU-201CR, rear viewProcessor Unit Processor unit, rear view Connection of cablesCable XH10P-W-6P L=20/30M Location of connectors Location of connectors inside the processor unitSignal cable RW-9600 Between antenna unit and processor unit Power cable TPYC-1.5Connection of Sub-display Port Conventional remote display FAR-2167DSFabricating cable connected to terminal TB1, TB2, TB3 Power supply unit, inside viewTerminal TB1 cable DPYC-2.5 Armor Processor unit Changing AC Power SpecificationPower supply Fuse Jumper connector P108 Processor unit, inside viewHow to adjust the overvoltage detection circuit Power supply unit Power Fuse Jumper connector P8How to adjust the overvoltage detection circuit Adjustments Initializing TuningHeading Alignment Heading alignmentInitialize menu For Control Unit RCU-014For Control Unit RCU-015 Echo ADJ menuHow to access the Initialize Menu with Control Unit RCU-015 Adjusting Sweep Timing Examples of correct and incorrect sweep timingsSuppressing Main Bang Other Settings Echo menu settingBlind Sector 1 and Blind Sector Scanner menuANT SW and ANT Stopped Radar no and Radar Posn Installation menuOn Time and TX Time LENGTH/WIDTH, Scanner Posn and SUB Scanner Posn OWN Ship Info menuGPS 1 ANT Posn and GPS 2 ANT Posn ARP W/O Gyro Not shown on IMO radar Arpa Preset menuARP-related menus ANT Select EAV w/o Gyro Other menuOther menu This page intentionally left blank Installing the Gyro Converter board Gyro Converter GC-10Fixing Gyro Converter board inside the processor unit Connecting connector assemblies inside processor unit Wiring Wago connectorAttaching plastic cover for Gyro Converter board Default setting Connection of external power supplyDIP switch, jumper wire settings Connection of external power supply to Gyro Converter boardJP1 Setting method 2 by make and model of gyrocompass JP1 JP2 JP3 JP4 JP564P1106 Gyro Converter boardSetting the heading readout on the radar display HDG menuFlush mounting dimensions for memory card interface unit Memory Card Interface UnitOne memory card if unit and one processor unit ConnectionsDesktop mount One memory card if unit and multiple processor unitsType Code No Contents How to wire the DVI-RBG conversion board DVI-RGB Conversion KitProcessor unit, side view Processor unit bottom chassisConnecting wires to the housing BNC Connector Converter DVI-RGBInput Data Specifications Contents RemarksOutput Sentence and order of priority IEC 61162 input sentence and priorityIEC 61162 output sentence SentencePacking List 1 SN30AF/SN36AF 70+6 000-157-497-10 工事材料表 000-155-826-10 PSU-006 AC100V 付属品表 03GL-X-9506 . CU-200-FAR GC-10-2 GC-10 $40# Page Page May 1707 R.Esumi Sep/2010 Y.NISHIYAMA Page Jan.1808 R.Esumi Apr.2307 R.Esumi Apr.2307 R.Esumi Apr.2307 R.Esumi Apr.2307 R.Esumi Apr.2307 R.Esumi Page Page Page Page Page Page Page Page Page Interconnection Diagram