1. MOUNTING
9. Attach three EMI cores to the signal cable as shown below.
| J821 VH9P | |
| J822 | VH2P |
Lead in | J824 | NH13P |
|
| |
cable here. | J823 VH4P |
EMI core
Clamp
Route cable along here.
Figure 1-15 Antenna unit chassis, cover opened
10.Fix the signal cable with the cable clamp.
11.Release the stay and close the cover. Loosely fasten the cover fixing screws; you will have to make some adjustments inside after completion of wiring.
Note: When closing the cover, set the gaskets to grooves in the bottom chassis, then tighten bolts.
BOTTOM
CHASSIS
GROOVE
GASKET
SCANNER BOLT
Torque :9.8 ± 0.1 N • m
Figure